B.E ( Mech.) from I.E.T. Khandari, Agra with 73.9 % in 2009
12th from Allahabad Board with 64.8% in year 2004
10th from Allahabad Board with 62% in year 2002.
Computer Proficiency
MS-Office, Outlook Express, MS-outlook
Excellent command on AUTO CAD , PRO-E & UGS from P.P.D.C. Agra .
Knowledge of C.N.C. Milling from P.P.D.C. Agra.
Knowledge of Hardness & Tensile testing from P.P.D.C. Agra.
Area of Interest - “Automobile Engineering” & “Production”.
Worked on plastic material like PS, PP, LDPE, HDPE & ABS.
Knowledge of Roto molding, Blow molding, Injection molding, Compression molding &
Hand molding Machines.
Undergone training of ERP at citrix platform.
Senior Production & Assembly Engineer
Since September 2010.
Company Profile: Leading manufacturer in plastic molded Fuel Tanks, Toys, Play ground equipments Mannequins, furniture & Other Automobile parts.
Job Profile:
Machine job setting and start production as per planning
Prepare daily mold change schedule as per planning
Preparation and implementation in process
Co-ordination between team member and various departments
Preparation of monthly production report and product efficiency
Maintain the control chart to identify the process status and do the KAIZEN, 5 S & TPM activities to improve quality process and reduce wastage.
To take necessary corrective/ preventive action on quality level improvement and customer complain related to molding
Trial of new mold and preparing process data sheet
Analysis of production & assembly problems and trouble shooting
Preparing daily production / assembly report and entry in software copy (ERP)
Effective handling of machines & materials.
Maintaining Production & Assembly related documents.
Maintaining 5-S on line & training operators for the same
Service Engineer
From Aug 2009 To Jul 2010
Company Profile: Service Provider of Contractors Of Air Conditioning Plant, Contractors Of Mobile Air Conditioning Plant, Contractors Of Central Air Conditioning Plant, Contractors Of Air Washer, Contractors Of Absolute Hepa Filters.
Achievements
Change the design of cutting template to remove the post molding problem in Consoles.
Add Teflon sheet in console’s mold to reduce most molding operation, time also labour
Change in mold of Nissan Air Duct give big slot in mold to reduce thickness & make
post molding operation easy.
Change the design of six post insert of Sonalika fuel tank insert to remove the step at six post area.
Change the design of neck insert of Sonalika fuel tank to remove the leakage problem.
To find full time opportunity in a challenging & dynamic work environment, where I can utilize my strong technical, analytical and interpersonal skills.
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com