Ref. No. : CA - 10995 - (Production Planning - Plastic Products and Processing – with 18.3 years in Plastic Industry)

Education

B.Tech Mechanical (final year)
Post Diploma In Plastic Machine Maintenance from CIPET, Ahmedabad with 79% (All India Rank 3rd)
3 Year Diploma In Electronics Engineering (B.T.E., U.P.- Lucknow) with 78.91%, U.P (2nd Rank In College).
10+2 (Physics, Chemistry, Maths) Science with 63 %
10 with 64%

Skill Sets

1 Year Diploma in DCA (Diploma in Computer Application

Work Experience

Sr.Plant Engineer (Injection Molding and Blow Molding)
Since Aug 2010
Company Profile: Leading company in manufacturing and supply of industrial packaging container for edible oil, butter, paint and beverage industry in Caribbean.
Job Profile:
Production Planning & Achieve the Production target with quality proof product.
Manpower Handling & proper utilization.
Reduce Rejection.
Breakdown & Preventive Maintenance.
Root Cause analysis & Why-Why analysis.
Co-ordinate with Quality & Design Department for Product development.
Power Saving Projects & Machine Utilization.
Parameter setting as per mold & materials.
Trial of new mold & machines
Trained and motivate the operators.
Continual improvement as per customer requirement.

Service Engineer/ Maintenance Engineer
From Nov 2008 to Jul 2010
Company Profile:
Manufacturer of Injection molding M/c, All auxiliaries Equipments & Robots Automation, Control System.
Reporting to: General Manager
Job Profile:
Sales & servicing of all Machines & Auxiliary Equipments & Robots
Technical support to customers as an Application Engr.
Sales & servicing of IMM.
Assist to develop business.
Achieve the target & Goals of Company.
Provide servicing of Injection Molding Machine.
Installation & Commissioning of Robots
Installation & Commissioning of Auxiliary Equipments.
(Handling Machine/Equipments in Western Region);
Injection Molding machine.
Pick & Place Robots (3 Axis Servo Robots)
In Mold Labeling System for Packaging Industries.
Conveyor System for Robot Automation.
Dehumidifier, Dryer, MTC, Centralized material Loading System.
Provide training to Customer:-
Injection Molding Machine (Toggle Type, & Ram Type, All Electric Type)-
Hydraulic Training, Preventive maintenance, control system & Condition Monitoring Training.
All Types of Servo Robots:
Pick & Place 3-Axis Servo Robots.
Semi Servo Robots,
IML-In mold Labeling Automation with Robot ( Side Entry Robots & Top Entry Robot)
All Auxiliary Equipment Operation & Training.

Engineer (Maintenance) (Injection Molding & Blow Molding)
Aug. 2007 - Oct 2008.
Motherson Automotive Technologies & Engineering Ltd
Company Profile: Plastic Injection molding machine, Auxiliary Equipments.
Reporting To: Maintenance Manager
Job Profile:
To attend preventive and running breakdowns in plant.
Maintenance of injection molding m/c’s (60T-1800T)
Maintenance & operations of cooling tower and chilling plant
Maintenance & operations of utility dept.-DG Sets, air and nitrogen compressor etc.
Do other maintenance works with maintenance team according to nature of faults.
Other work As Per Responsibility (PM-PLANS, RCA, 5- WHY ANALYSIS) & Maintained the history sheets of all machines & auxiliary equipments.
Energy saving project work.
Maintenance of other auxiliary equipments as well as material handling equipments.
Predictive maintenance & Condition monitoring with maintenance team.
Machines & Auxiliary Equipments (Handling):
Injection Molding Machines:
FCS (60T 7 700 T)
MitsubishI (150T, 650T, 850T, 1300T 7 1800T)
MIEKI (350T & 450T)
Borch (120T & 200T)
Ferromatic Milacron (250T)
Engel (85T)
L&T Demag (80 T)
Toshiba (Electrical) (220T, 280T)
Fanuc (125T)
Kraussmafee (160T)
Auxiliary Equipments:
MTC & HRTC
Chiller
Vacuum Loader & Hopper Dryer
Dehumidifier
Doser Mixer & Granulators
Robot (Star & Sepro)
N2 Generator & N2 Compressor
Mold Maintenance (Heaters & Thermocouple)

Operator Injection Molding M/C (Contract Basis)
May 2003. - July 2004.
S.I. Precision Ltd
Job Profile:
Worked as per Given instruction by Manager/ Shift Incharge. (Operating Machine, Mold loading)

Future Goals

To contribute in challenging environment with my skills and capabilities to help achieve the company’s goals and objectives.

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com