Diploma In Electrical From Puranmal Lahoti Gov. Polytechnic, MSBTE in 2008 with 56.6%
High School From Maharastra Board in 2002
Handling daily scheduled Production and troubleshooting of process.
Monitoring shift wise production to improve production efficiency.
Implementing new technical method to improve the working system.
Analyzing and providing feedback on new product after installation.
Working as a Production Specialist in Technical Team.
Total involvement in erection & commissioning of plant & successful stabilization for continuous production, cost control & analysis including all production activities and positive involvement in higher management decision & strategic planning.
Production planning, Control & setting production targets.
Production-rejection downtime analysis & making preventive action plan for rejection.
Maximization of production, machine utilization while maintaining the quality & achieved the production targets.
Using strong command on plastics processing, controls the rejection & fast trouble shooting.
Participating in preventing & breakdown maintenance to reduce the mach
Shift Incharge
Apr 2013 to Apr 2018
Company Profile: Manufacturer of Cross- Laminated Films, HMHD Films, Multilayer Films, PVC Piping Systems.
Job Profile:
Handling daily scheduled Production and troubleshooting of process.
Monitoring shift wise production to improve production efficiency.
Implementing new technical method to improve the working system.
Analyzing and providing feedback on new product after installation.
Working as a Production Specialist in Technical Team.
Total involvement in erection & commissioning of plant & successful stabilization for continuous production, cost control & analysis including all production activities and positive involvement in higher management decision & strategic planning.
Production planning, Control & setting production targets.
Production-rejection downtime analysis & making preventive action plan for rejection.
Maximization of production, machine utilization while maintaining the quality & achieved the production targets.
Using strong command on plastics processing, controls the rejection & fast trouble shooting.
Participating in preventing & breakdown maintenance to reduce the machine breakdowns and increasing the productivity.
5S, Fire Training to people involved in quality circle.
Making man & machine performance & efficiency reports.
Team building, Manpower planning, handling & control.
Shift Engineer - R-PVC Plant
Feb 2012 to Mar 2013
Company Profile: Leading polymer processing company.
Jr Production Engineer.
Apr 2010 to Feb 2012
Company Name : Finolex Industires
Job Responsibility
Production planning of (Min Max Stock level, Inventory Level, follows etc).
Inventory Analysis, Periodic Status Analysis.
Achieving production and quality targets.
Controlling Downtime&Wastage,Making POA & its Implementation.
To Maintain House Keeping(5 S PLANNING).
ISO 9001-2008 Documentation.
Supervising and Training of Sub-Ordinates & making Skill Matrix.
Planning and Co-ordination with Maintenance for Preventive and Breakdown maintenance jobs.
Focusing on areas like cost reduction / improvement of productivity.
Reporting of Daily Production Data, Daily Running Sizes, And Daily Status to management.
Effective utilization of manpower.
Faced quality audit (internal-every quarter and external-every year).
Analysis on process deviation, product validation, QA rejection & Rework.
Autonomous Maintenance planning & its implementation.
Handle to compounding dpt.
Training
CIPET BHOPAL stc on manufacturing, testing, & quality control of upvc from 06/02/2014 to 07/02/2014
Bureau Veritas internal auditor training course on integrated management systems & work shop on leagal requirements fom 09/09/2014 to 12/09/2014
Achievement
Best Employee of year Award By S J Taparia (Executive Director) for year 2016-2017
Exposure On Machine
Extrusion Machine with the capacity from 120 kgs to 1500 Kgs/Hr for UPVC Pipes
Kabra Extrusion Technique (Paralle) Twin Die Head & single 65/22, 90/25, 92/28, 135/28,
Theyshon Machines (AUSTRIA) Twin Die Head & single TTS-88, TTS-98, DS-100, OMINA-108
Online Pad Printing Machine
Magnum socketing machine
Vihan socketing machine
Technical Activities
UPVC pipes ( 20mm to 315 mm) with different pressure rating like class-2.5,4,6,8,10 as per (IS- 4985 -2000 )
UPVC Commercial pipes
Plumbing pipes as per ASTMD-1785 (½’’ to 5’’)
Bore well pipes as IS-12818 (RS ,CM , CS Size 11/2’’ to 10’’)
Column Pipe (Rising Main Pipe )-1’’ to 4’’ Heavy & Medium Duty
SWR Pipes as per IS-13592 (40 mm to 200 mm)
Control to compounding Dept.
Seeking a challenging position that leverages my knowledge and experience to get most of the executions beyond the expectations and to make a brand value for the organization.
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com