Master Certificate in Advance Computer Aided Design (unigraphic software) Penta four Institute Singapore (2001)
NTC-2 precision engineering ITE in Singapore (1998)
Mould Design Course Ngee Aann Polytechnic, Singapore (1998)
Computer soft wares;
Internet, Email
MS Word, MS excel, MS Power Point
C ‘language basic
VB basic
Unigraphics cad software
Master cam basic
Auto cad basic
Written and Spoken Language;
English (written and spoken)
Tamil (written and spoken)
Kannada (spoken)
CAD Engineer
Nov 2007 to June 2008
Responsibilities
a) Team center, Take care latest files in Master assy and updated file from designer and check interference as well
b) Prepared 3D Model and update
c) Prepared 2d drawing and update
d) Upload 3d file to supplier and customer within tight schedule
e) Problem Solved given to vendor clarifications
Mould Designer
Dai Ichi Company
Jan 2007 - Nov2007
Responsibilities
Plastic moulds
a) Over all in charge of new tooling design and product till customer approval
b) Meeting with customers when there is new tooling
c) Carryout mould design once the information is confirmed
d) With assembly drawing get approval from the manager or customer before Proceed the mould design
e) After completed the design to check the drawings to minimize the error
f) Follow up and feed back on mould testing result to relevant person
g) Record the corrective action onto new mold report and carry out repair with Reference to inspection data.
Update drawing when:
Dimension need to alter to suit molding condition
Out of specify dimension due to shrinkage problem
Mould modification requested by customer
Design Engineer
HI TOOL (S) PTE LTD
Oct 2006 - Jan 2007
Responsibilities
Plastic moulds
a) Over all in charge of new tooling design and product till customer approval
b) Meeting with customers when there is new tooling
c) Carryout mould design once the information is confirmed
d) With assembly drawing get approval from the manager or customer before Proceed the mould design
e) After completed the design to check the drawings to minimize the error
f) Follow up and feed back on mould testing result to relevant person
g) Record the corrective action onto new mold report and carry out repair with Reference to inspection data.
i) Update drawing when:
Dimension need to alter to suit molding condition
Out of specify dimension due to shrinkage problem
Mould modification requested by customer
Cad Cam Engineer
ESCATEC ENGINEERING PTE LTD
Jan 1996 – Oct 2006
Cad Cam programmes in accordance with the procedures set under the ISO9001
Standards
Responsible for settling all cad cam issues with tool room and vendors
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com