Diploma In Mechanical Dr. S S S Ghandhy College of ENGG Tech, Surat October 1995 70.1
Engineering AutoCAD Central Institute of Plastic Engineering Technology
S.SC Gita High School, Lambha March 1992 74.00
Computer Knowledge
Designing Software-: Solid Works ,CATIA 4.2,Mechanical Desk Top 4 Pro E
General-: Windows XP,Windows NT, Microsoft Office Net working.
Unix ERP System-: MFG-Pro (EB2) ,Symix.PRMS
New Product development & Quality Control
Assistant Engineer (Product Engineering Dept.)
August 2006 to till date
October 1996 to April 2005
Company Profile : Manufacturer of modern Blow room machines, High Production Cards, High Speed Draw Frame & Filter for Waste collection System.
Company has latest varieties of CNC Turning & Machining Centers,
Laser Cutting, CNC Bending, & Structural, Fabrication & Assembly Shop with Fully Automatic Powder Coating Plant. Present Project Design task of new Blow room machine.(Bale Opner)
Job Profile
Prototype Product design
3 D Model Design in Solid Works 2003.
Configuration of Product in Solid Works.
Explosion of assembly drawing for Spare part Catalogue.
Ensuring availability of Operation Aids
Observation for Operation Method & Timing
Look after Prototype`s Manufacturing & Assembling
Solve technical problems as technical service
Drawings & Operation Study
Identify & decide whether manufacturing should be done in side or outside.
Prepare complete Bill of Material.
Release variable detail as per customer requirement to concern department.
Design & Develop new assembly as per suggestion of customer satisfaction department
Design & Manufacture Jigs & Fixtures Design.
Bill of Material Creation
Creation of data in System.
Communicate with Planning & Purchase for MRP related data.
Release & Communication
PPC for planning parameter and Proto type Manufacturing.
Purchase for Purchase Parameters & new development.
Concern Shops for Information Updating.
Study & Release Modification received from parent company.
Quality Assurance for Information
Local Job Processing
Study existing process & product design.
Prepare Drawings as per Local Requirement in Catia, Solid Works.
Process Modification as per the feedback received from Concern Department.
MFG Pro related Activities
Item Master Creation
Planning data creation
MRP related data i.e. lead time, batch quantity, Safety stock etc decide
Product Structure Creation
Product Configuration in system
Routing /Work Center Creation
Engineering Change Order Creation & Implementation considering
Existing stock,Work in Processed job, development time etc.
Working Under better House keeping & Discipline System 5-S
Maintain Technical Library & Utility like 3-M reader Printer,
Laser Printer, Scanner, CD writer.
Senior Engineer
April 2005 to August 2006
Worked with Ferromatik Milacron India Limited
Company Profile
The company is a majority owned joint venture of Milacron Inc. USA, the global leader in plastics injection molding machines.
Work assign Receive Engineering Enquiry for existing product.
Support sales department to scrutinize different engineering Options available or not available, If not available than perform design, calculation for the same and prepare offer
Release material requirement for the same.
BOM structuring / checking for easy & fast order execution and to support Planning department.
Design review for different features and standardization to control inventory.
Identify root cause for any problem in workshop and to solve it
permanently with the help of other cells.
Technical services to shop & vendors.
Coordination with Planning, Purchase , Assembly department, Electrical Cell, & Hydraulic Cell
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com