Degree/ College / University : B.E. Electrical College of Engineering Pune.
age of Marks : 64
Year of Passing : June, 1982
Subjects offered : Elect. Design, Control System, Switchgear and Protection.
Presently working at a leading processor in Africa as Chief Engineer since Oct 2006 Presently looking after all Projects and Maintenance.
Job Profile
Responsible for every engineering Activity with project/maintenance department.
Includes all utilities like Generator/Chillers/Compressors/AC/DC Drives/PLC
Energy Auditing/IS0-9001 Auditor. Vendor development/Training for employees.
Joined Fluent India Pvt. Ltd, Pune On June 2004 - Oct-2006 as Executive – Facility Management.
Joined Pipes & Plastic Products Ltd., West Africa Ghana as Plant -in-Charge
Job responsibilities:
Production/Maintenance In charge, Daily Production Planning/Allocation of labour force. Worked as Chief Engineer.
Preventive / Predictive maintenance of Utilities/Extruders/Mixers/Pulverizes/grinders etc. Installation & Commissioning of New Extruder plants for PVC pipe manufacturing.
Installation and Commissioning of following:
o Microprocessor based temperature controllers.
o Programmable Logic Controllers.
o Variable speed drives, ABB make, range 1.5 kW to110 kW Induction motors
o Soft start Drives, ABB make
o Also worked as Electrical Maintenance In charge for our subsidiary P.U.
o Foam Manufacturing Unit in Ghana. .
• Active Participation in ISO - 9001 / 2000 activities.
Joined Finolex Pipes Ltd., PVC Pipe manufacturing Unit, worked as Assistant Manger – Maintenace.
Duration : 1993 To 1996
Job responsibilities:
Incharge Of Utilities / Services Dept.
Plan Electrical & Mechanical Preventive / Routine maintenance & trouble
Shooting of DX - WATER CHILLERS - Plant capacity 150 Ton ALFA - LAVAL & KIRLOSKAR refrigeration compressors/ carrier central plant 60TR.
Diesel generating sets Cummins make, Synchronizing / Parallel Operations/ AMF Panels.
ATLAS COPCO Make GA 37 Screw Air Compressors, Ingersoll Rand Reciprocating Compressors.
i) Street lighting, Centrifugal Pumps, AC Induction motors upto 110 KW.
ii) Control, Monitor, allocate, work force & control minimum stock level for spares / development of suppliers.
iii) Preventive maintenance of H.T. Transformers total capacity up to 3000 KVA, HT SF 6 circuit breaker 22 KV. OCB’s ACB’s up to 1600 Amps capacity, LT Panels cabling and ducting, Lighting Installations.
iv) Working as a Shift-in-Charge of maintenance Dept. in PVC pipe manufacturing Unit.
v) Active participation in ISO 9002 / Safety Committee member/ Energy conservation & Audit committee member.
Joined M/s Desai Electronic Pvt. Ltd., in March 1991.
Worked as Asst. Maintenance Manager (Electrical).
Period – March 91 to Nov. 1992.
Details of Experience : M/s. Desai Electronics Pvt. Ltd.
i) Preventive And Routine Maintenance of H.T. Ovens, Motors, Power transformers, Reactors, Reciprocating Compressors, Vacuum Pumps, Welding Sets, Injection moulding machines, D.G. Sets (CUMMINS), SPMs, Air conditioners, Blowers, Switchgears.
ii) Maintenance of sophisticated SPMs employing electric controls for electro-hydraulic & electro-pneumatic circuits.
Job responsibilities : Electrical design/drawings, raising Purchases Orders, L.T. Power Distribution, Plant Inspection, Training Classes for workmen, Liasioning with Govt. Agencies.
Details of Experience – M/S Greaves Ltd., Pune.
Period – 1982 to 1991
I. Engine & Gensets – Erection, Assembly, Testing, Manufacturing.
II. Assembly of fire fighting pump sets AMF Gents, synchronizing and parallel Operation up to 1000 KVA.
III. Assembly of gearboxes for marine propulsion.
IV. Special Achievements : worked as a Project-in-Charge of Defense Trailer Mounted D.G. Sets. Development Of Prototype Models.
TRAINING AND EXPERIENCE:
After completing training of 1 year from July 1982 to 1983, I had worked in The Engineering Dept. (Production) of M.W.M. Engine division in M/s Greaves Ltd., Pune upto year 1991.
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com