Ref. No. : CA - 5621 - (Maintenance and Service - Mechanical – with 21.2 years in Plastic Industry)

Education

PGDPE Central Institute OF Plastic Engineering Technology, Chennai
B.E Mechanical Engineer Adhiyamaan Engineering College, Hosur.

Compute Knowledge:-
Ms- Office World, Excel, PowerPoint

Skill Sets

Having exposure in manufacturing Systems.
Exposure in Modern Production System like Kaizen, JIT, Kanban, SMED.
Inculcating the Employees for high quality & Online packing
Knowledge and application of related measuring / monitoring instruments.
SPC Implementation

Work Experience

Engineer QA
Sept 2004 to till date.
Company Profile : Manufacturing of Engineering Plastic Moulded, Painted parts & Assy Parts. Supplying to ancillary unit of Ford Hyundai, visteon, Air international, Lear Corporation Actia and GMI etc.
Job profiles :
Having good knowledge in injection molding & paint shop
To make PPAP, PFD FMEA, CONTROL PLAN for all the products
Ensuring quality of all incoming materials and out going finished goods and packing.
POKE YOKE ON critical operations to eliminate manual errors.
To conduct process capability study and MSA
Ensuring non-conforming materials to avoid mixing with accepted material.
Trouble shooting the process defects
Analyzing the defect using brainstorming, cause & effect diagram, paretto Chart & control charts.
Motivating workman to achieve higher productivity.
Training employees in manufacturing and quality
Cost reduction through quality improvements
Conducting internal quality audits
To make visual aid, operator work instruction for on line works
To work closely with Production and other supporting departments for the smooth running of high quality products and resolve process related issues on the production line.
Supervision a Control of Non-Conformance & initiating corrective actions for customer complaints, supplier quality problem, and In-house quality problem.
Guide the inspection team to carry out Incoming material inspection, In-process Inspection, Final Inspection & Layout Inspection.
Achievements:
Reduced internal PPM from 30000 to 16500.
Achieved 100 PPM at customer end.
Achieved Q1

Maintenance and Service Engg.
Aug 2003 to Aug 2004
Worked with R.S.K.Motor

Future Goals

Striving for success without hard work is like trying to harvest where you haven’t planted meaning to say that I strongly believe that hard work never fails.

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com