Ref. No. : CA - 20530 - (Maintenance and Service - Mechanical – with 21.5 years in Plastic Industry)

Education

Electrical Engg. From Institute of Petrochemical Engineering, Lonere, Dr.Babasaheb Ambedkar Technological University in 2003 with 60%

Advance Diploma In Industrial Safety College Of Kishor Jain, Nagothane in  2012  

Skill Sets

Team Work Capability.
Hardworking Capability.
Co-coordinating

Computer Literacy: -
AUTO-CAD
SAP
Tally.ERP 9
Microsoft world, Microsoft Excel

Training& Certified Course of  SwitchGears & Maintenance. 
Training& Certified Course of  Fundamentals of DCS Systems.(YOKAGAWA)

Work Experience

Sr. Maintenance/Project Engineer 
Since Jul 2008
Company Profile: Engaged in manufacture and sell of surfactants and anti-oxidants in Domestic and International Markets. It is also a market leader in antioxidants, ethoxylates, emulsifiers, surfactants & other specialty chemicals. It is an ISO - 9001: 2008 companies. 
Job Profile:
Reporting to Project Manager/Operation Head.  
To look daily Maintenance in plant.
To manage & execute current on going projects.

Project Engineer 
June 2005 to July 2008 
Company Profile : Manufacturer of speciality chemicals

Maintenance Executive
June 2004 to June 2005
Company Name : Nirlon V Belt Ltd
Company Profile : Manufacturer of V Belts. 

Electrical Engg
June 2003 to June 2004
Company Name : Sudarshan Chemicals  Ltd,Roha
Company Profile : Manufacturer of Pigments, Mica & Pesticides.

Job Profile : 
Co-ordinate with project manager for preparing cost estimation for the proposed project to be sent for approval.
Co-ordinate with Engg. Purchase for equipment/materials purchase checking the specification.
Basic design calculation of reactor, pressure vessels, and storage tanks & coordinating with consultant for detail design as per application.
Prepare project work order on approved contractors as various disciplines as per approved quotation & as per the scope of the work defined by design, drawing & by Project Manager.
Inspection of equipment such as Reactors, Centrifuge, ANF, Pumps, storage tanks, Pressure vessels  erection work, process & utility piping as per P&I diagram.
Reading, finalizing Project drawing with AUTO CAD.
Regular inspection of job carry out by the contractor.
Co-ordinate with the contractor for field/project work to completion 
of project.
Timely completion of project jobs.
Development of job to decrease process cost & time.

Projects:-
Completed Project:-
S.S. Flaker Conveyor
For flakes manufacturing.
Conveyor Dryer
Drying unit for “SUN THEIC”.
It is a drying unit with overall length of 60 meters. With two sections one hot & other is cold section. Throughout length hardness & moisture is controlled with help of heat exchanger & AHU.
Procurement, installation & commissioning of STEAMBOILER
TPH capacity with 3 Pass arrangement, 192 m2 -surface area.
Procurement, installation & commissioning of THERMOPAC
Temperature range 300 c (capacity – 4.0 lack kcal/hr.).
Procurement, installation & commissioning of 1500 TR COOLING TOWER.
“Paharpur” Make cooling tower.
CCoE Liaison, installation & commissioning of10 KL LIQUID NITROGEN STORAGE.
Effluent Treatment Plant for chemical waste from the manufacturing plant of capacity 20 m3/hr.
Air Handling Unit for packing room.
50 TR chiller ‘kirloskar chiller’ make.
CLASS  ‘B’  Storage Tank  Installation. 
Prepare a record of ASSET REGISTER.
Prepare all process & utility P & ID’s as per existing plant

On Going Projects:-
Detail Engineering study of strategic Project for capacity enlargement of plant & safety improvement for safe operation, revamping project for debottlenecking process.
Ongoing projects of worth 61 Cr.
Unit-1
Installation of 40 KL EO storage tank with CCoE approval.
Installation of four zero leakage canned pump of Hermatic make.
EO & PO scrubber column system.
Installation of Hydrogenator with 45 bar design pressure.
Installation DCS for process operation. 
Installation of new line up of three reactors.
New crystallizer with centrifuge system. 
New cooling tower 500 TR.
Unit-2
Installation of 5KL Distillation Reactor.
Installation of 15KL Formaldehyde Storage tank.
Installation of Formaldehyde Scrubber Column System.
Detail Engineering study of strategic Project for capacity enlargement of plant & safety improvement for safe operation, revamping project for AO debottlenecking process.
Ongoing projects of worth 08 Cr.

Achievements:-
Detail study, installation & commissioning of Conveyor Dryer system worth Rs 1 Cr. in 2010 to 2011.
Procurement, installation & commissioning of Solvent recovery system worth 2 Cr. in year 2011 to 2012.
Procurement, installation & commissioning of Steam Boiler 5 Ton in year 2012 to 2013.
Procurement, installation & commissioning of Cooling tower of capacity 1500 TR in year 2012 to 2013.
Having good knowledge of national and international engineering standards, codes and practices applicable to plants &equipment relevant to rotating machines in Chemical / Petrochemicals industry. [Example - ASME, TEMA, IS 2825 etc.]
Installation & Commissioning of 10 KL storage tank for Liquid Nitrogen in year 2012-2013.
Coordination & valuable inputs for Successful completion of Process hazard analysis from region team on batch process production.
Procurement, installation & commissioning of Class B Petroleum tanks in year 2012-2013.
Execution & commissioning of Strategic Project of 50 days’ worth 20 Cr. include installation of 5 KL Hydrogenator, crystallizer, and Centrifuge & EO / PO scrubber column in year 2013 to 2014.
Installation & commissioning of DM water plant of 5 m3/hr. 
Worked on many TQM , 5S and cost saving projects.
Worked as Department Representative for ISO 9001:2008.
Planning, execution of Ongoing Strategic Project for plant worth 35 Cr. Containing 90 days shut down in Dec 2014.

Area of Strength:-
Team Work Capability.
Hardworking Capability.
Co-coordinating.

Future Goals

To work in a creative and challenging environment where acquired skills and education will be utilized towards continuous growth and advancement.

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com