Diploma in Plastic Engineering (3 years), from Government Polytechnic Miraj (affiliated to the BTE.) in 1999.
Member Staff (Injection Molding)
July 2007 to till date.
Work Description:
Process setting & in-process troubleshooting.
Planning of Man & machine & Material requirement.
Trial of new mould as well as mould supplied by customer.
Process optimisation.
Reduction of rejection percentage.
Maintaining system documentation required for TS. etc
Senior Engineer (Injection Molding)
June 2005 to June2007
Worked with Lumax Industries Ltd.Chakan, Pune.
Work Description:
Production & Customer complaint
L-90 Project.
Shift Incharge (Injection Molding)
Aug 2004 to June 2005
Worked with Arzo Plastics P.Ltd. New Mumbai.
Work Description:
Mould & Process setting & in-process troubleshooting.
Mould Preventive & Breakdown maintenance.
Machine, Dehumidifier, hopper loader, MTC Preventive & Breakdown maintenance.
Planning of Man & machine & Material requirement.
Trial of new mould as well as mould supplied by customer.
Process optimisation.
Reduction of rejection percentage.
Maintaining system documentation such as mould & machine & equipment maintenance schedule, daily records etc
Production Engineer (Injection Molding)
March 2003 to May 2004
Worked with Shutam Electric Ltd., Pune.
Senior Technician (Injection Molding)
May 1999 to March 2003.
Worked with Varroc engineering Ltd., Takve Bk., Pune.
Work Description:
Mould & Process setting & in-process troubleshooting.
Checking Weather process and machine are in within control by producing Control chart. If not, taking corrective steps eliminate the problem.
In process inspection and Manpower handling.
A Responsible position in an organization where, knowledge about plastic materials, Process & machines. Troubleshooting and planning, along with good man management skills are required.
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com