A) Draughptsman Mechanical Government Technical Center, VALSAD Jul- 91 75.70
B) AutoCAD:- Dataworld Computer Center - VALSAD, Apr-92 Grade- A
C) Diploma Mechanical:- Government Polytechnic - VALSAD Oct-97 70.00 (Part time)
Presently working at a leading manufacture of Polypropylene Spunbonded Non Woven Fabrics.
Designation: Production Incharge
Duration: Oct 2001 to till date
Reporting to Production Manager / Prod. Vice president.
* Machine Handled: REIFENHAUSER make fully automatic German Machine.
* Material Handled: PP & Additives.
Job Responsibility: -
# Daily production planning inconsulation with Production Manager, so as to achive the target in stipulated time.
# On - line process quality control.
# Optimization of process parameter for production.
# House Keeping and process development.
# Man power management
# Look after all activity of Production, Quality and maintenance during shift.
# Also look after about electrical & Electronics general maintenance.
Propack Industries, Daman
Designation: Shift Supervisor
Duration: Feb 1999 to Sep 2001
Reporting to Production Incharge / Prod. Supervisor.
* "Mbe " make semi automatic multilayer blown film plant
* Material handle - L.D.P.E, L.L.D.P., H.D.P.E, & Additives
Job Responsibility: -
# To operate Blown film extrusion machine - Semi automatic - 02 Layer
# To maintenance of machine as rewinding m/c, Embossing M/c, Slitting M/c etc.
# To handle Raw material stock and Production Quality.
# House keeping and man power management.
SAMIR ENTERPRISES - VAPI.
Duration: Aug 1995 to Feb 1999
* Maintenance contractor of ATUL LIMITED, ATUL
* Maintenance contractor of continuous process chemical plant
ATUL - The largest company for manufacture of Dyes, medicine, Polymers, Fertilizers and Pesticides.
Job Responsibility: --
# Routine maintenance jobs on day to day basis in plants.
# Breakdown, Preventive and regular Inspection jobs for chemical plant equipments as Reactor, Glass line vessels, Lead line vessel, Storage Tank, Measuring Tank, Rubber line vessels, Condenser, Gear- box, Pressure vessels, Auto – Clave Vaccum ejector etc.
# Look after for manpower of all maintenance jobs.
# All maintenance work measurement taken and make approval from Plant Engineer.
# Labour Present mauster attend and also make salary work.
* H.D. ENTERPRISES - VALSAD.
From 01/07/1991 to 31/07/1995: -
* Manpower supplier of ATUL LIMITED, ATUL
* Man power supply for project work of Continues process chemical plant at ATUL LTD., - Dyes Plant.
Job Responsibility: -
# Drawing of chemical plant equipments.
# Piping Drawing of chemical plants and equipments.
# Drawing of process plants E.L.D. And P & I Diagrams.
# Drawing of Civil, electrical and instrument wiring diagrams also.
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com