Ref. No. : CA - 9310 - (Production - Moulding – with 48.8 years in Plastic Industry)

Education

Husky injection moulding course Bolton in 1985
Sperry Vickers hydraulics course T.U.N.S in 1983
Nova Scotia Power Industrial Power in 1982
Graduate Truro, NS in 1981

Skill Sets

Professional
Senior setup technician
Enhancement to moulds cycle, quality, stability.
Ensure all safety guidelines are met.
Part of the Joint health safety committee (J.H.S.C)

Work Experience

Senior Setup Technician
July 2007
Company Profile: Leading supplier of clinical and industrial specimen collection (plastic disposables) and transportation products.
Job Profile:
Managing 4 set up technicians and the 24/7 operation of the injection moulding machines
Maintain moulds work with mold maker on repairs and discovery for enhancement to moulds cycle, quality, stability.
Ensure SOP and GMP compliance.
Do resin performance testing and documentation
Train employees
Ensure all safety guidelines are met.
To assist set up tech with reoccurring production and quality issues. Order Tech supplies needed to operate the shop. Member of the Continuous improvement team

Plant Manager
July 1996 - July 2007
Job Profile:
Installing and maintaining 4 machines 40-500 ton and moulds, grinders and chillers, compressor material drying e.g.
Scheduling of production and maintenance Repair hydraulic systems, pneumatic systems, mechanical equip.
Implement maintenance program. Materials used PE, PP, nylon ,urethane, delrin Furniture parts, dept national defence subcontractor supplier, home ventilation parts, medical transfer tubes, agricultural livestock feeder parts, trailblazer parts (compact bow saws) and more

Production Manager
July 1990 - July 1996
Canadian Automotive Plastic Delbert NS
Job Profile:
Implementing factory setup from start i.e. buying and installing all machinery
Implement quality assurance program. implement S.P.C/six sigma Meet with customer on all aspects of production requirements, tolerances, quality, materials testing for production usage (type of plastic to be used, type of insert to be used etc) Hiring Staff and scheduling staff

Production Manager
1979 - 1990
Quality Containers Truro N.S.
Job Profile:
Install and maintain 8 machines 3 were husky (300 -500 ton) and thin wall moulds for the food industry.
Schedule production and maintenance, train employees.
Implement and maintain quality assurance program.
Meet with customer on all aspects of Product Design and Launch
Hiring Staff and scheduling staff

Future Goals

To obtain a full time Job and be a part of a growing successful Team

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com