Ref. No. : CA - 5379 - (Purchase – with 27.3 years in Plastic Industry)

Education

Diploma in Production Engg. From Board of Technical Education Mumbai In the year 1997 with first div.
12th , Science in 1993

Computer Knowledge
SAP R/3 Jd Edwords Ms Office Autocad.

Skill Sets

New Product development.

Work Experience

Senior Engineer : Supply Chain Management and Vendor Development
Feb 2006 to till date
Presently working with Voltas India Ltd
Company Profile
A recognized heavy engineering industry also an ISO 9001 company of TATA group of Industries at Pantnagar unit Supply Chain & Vendor Development of Unitary Product Business Group (UPBG). The division is engaged in Manufacturing of Commercial freezers and Sensicool Air conditioners for Telecom sector Ductable Air conditioners for Defense services Package unit Air conditioners Chocolate coolers for Pepsi/Nestle and Water coolers. The annual turn over of the company is 225crores (INR).
Job Profile
Supply Chain Management and Vendor Development for utilizing market potentials to ensure cost reduction and profitability.
Capital Purchase.
High negotiating skills towards cost estimation.
Well versed with system based ERP Environment.
Application of engineering skills for new product development through equipment study and set up equipment operations and process set up skills for required specifications at the final stage of assembly.
Gained exposure in areas of ancillarisation and inspection of components at suppliers end.
Core member in implementation of ISO TBEM Systems and procedures.

Senior Engineer (Purchase)
Jan 2005 to Feb 2006
Worked with Electrolux Kelvinator Ltd.
Company Profile
Electrolux Kelvinator Ltd is an Indian operation of Swedish Giant–AB Electrolux World Leader in White Goods featuring Fortune’ 500 with an annual turnover $16B worldwide. July 2005 EKL is taken over by Vedeocon Industries Limited.
Summary of skills and experience
Job Profile
Purchase/Materials with Electrolux
Inventory Management
To plan the requirement of materials as per Production Requirements given by Marketing Deptt.
Release timely purchase orders and schedules.
Ensure Inventory of Materials to be within preset levels.
Deal with Steel non Ferrous Metals CRCA HIP PP Paint powders Plastic sheets and components Sheet metal and assembled components Packing materials Cooling System Glass Chemicals Gas Paints Paint powder consumables Indirect and Machinery spares.
Analyze Material Cost Trend`s and forecast for future procurements.
Vendor Development
Select develop and finalize suppliers for manufacturing of Plastic Components sheet metal Components Machined parts tools dies jigs and fixtures.
Assess and Audit vendors for systems Capacities capabilities.
Product Development
Develop various parts required for Refrigerators.
Understand and communicate technical requirements to suppliers.
Localize imported components as per Quality cost and delivery norms for cost reduction.
Release job quantity and material for sub contract works.
Ensure excise and other statutory documentation.
Costing and Cost management
Calculate cost of parts in Plastic Sheet metal and Machined parts.
Calculate and maintain BOM monthly and yearly direct material cost.
Prepare Annual Business plan of Purchase and Materials and cost reduction plan.
Supply Chain Management
Co-ordination with PPC for monthly production programme and day-to-day production planning model wise color wise etc.
Follow up with suppliers for deliveries as per schedules.
Keeping track with QC and taking necessary actions for rejected material if any.
Maintaining the Inventory as per company policies for all the items.

Production Engineer
Jun 2002 To Dec 2003
PU Foaming Vacuum Forming & sealing Refrigerator Plant
Job Profile
Meeting the Daily & Monthly production targets.
Planning & scheduling color mix & model mix production plan released by PPC.
Ensuring optimum quality standards minimizing of idle time for machines keeping rejection volumes under control feeding the assembly section inventory control after every process etc.
Implementing & devising new simpler methods.
Significant Achievements In PU Foaming Dept.
Successfully started the production of NO FROST Refrigerators.
Successfully completed the CYCLOPENTANE conversion of PU Foaming.
Successfully installed the new PU Foaming moulds of NO FROST Refrigerator.
Reduced rejection of PU Foaming & Vacuum Forming.


Production Engineer
Feb1999 to May 2002
Compressor Machine Shop & Assembly
Job Profile
Production as per the scheduled plan meeting the Refrigerator Plant requirements. (Capacity of 3.25 lacks P. A. For captive consumption only)
Components – Crank case crankshaft cylinder piston cros

Future Goals

With the thrust to learn and grow along with the organization and excel in the field of Materials management touching the heights is the prime objective.

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com