Ref. No. : CA - 5922 - (Maintenance and Service - Mechanical – with 34.3 years in Plastic Industry)

Education

Diploma in Mechanical Engineering Govt. Polytechnic Khamgaon, Mumbai with 72.18 in 1989.

Skill Sets

Production, Maintenance & Vendor Development.

Work Experience

Deputy Manager (Maintenance)
Sep 2007 to till date
Company Profile : Polythylene Compounds, PVC Compounds, PPR Compounds, Filled PE Compounds
Job Profile
Significant Highlights.
Handling purchase indenting of departments as required.
Preparing departmental manual as per ISO 9001-2000 compliances.
Planning preventive maintenance schedule & implementing it.
Developing condition monitoring system for machines.
Mechanical Maintenance
Responsible for Periodical maintenance, Breakdown Maintenance & Preventive Maintenance for twin screw extrusion systems cable compound by Berstorff Germany, Buss AG, Switzerland. Total PLC control.
Spearheading maintenance activities, Stock Maintenance, Maintenance Schedule, Vendor Development, Contractor Allotment etc.

Senior Executive (Mechanical Maintenance)
Mar 1993 to Aug 2007
Worked with Caprihans India Ltd., Satpur, Nasik
Job Profile
Looking after routine breakdown & maintenance of machines, PVC Calendar m/c L type, inclined Z type, PVC & multipolymer extruder , coating m/c and plant shutdown maintenance.
Handling Mechanical Maintenance of below mentioned devices:
Boilers - Thermax make 3- pass reverse flue tube , chilling plants, Air-Compressor and screw Air drier refrigeration and desiccant type, Fire hydrant system
ETP-plant Cooling towers, pump house, D.G. set
Hydraulic power packs, Honeywell control valve, water treatment system, KSB hot water pumps, Rotory joints servicing , Vacuum pumps, Vacuum rolls, Vacuum blowers, Pneumatic conveying system for raw material , Silos, shot blasting system, plastic scrap grinders, servicing of various gear boxes - worm gear, PIV, multispeed, variable speed, planetary, bull gearbox, heavy duty gearbox, tool room for main activities.
Project Handled
Old machines shifting and installation, new machines installation, alignment, leveling, foundation work. Modifying existing machines, Automation project s on existing machines, Steam pipelines, Pnuematiclines, Process water - pipelines work.

Production Supervisor (Shrinkon Dept.)
Jun 1991 to Feb 1993
Worked with Moss Plastics & Films Pvt. Ltd., Ambad, Nasik
Job Profile
Handling all production & maintenance activities like planning, procurement, control & trouble shooting for achieving the planned periodic schedules, within budgeted parameters of the company.

Assistant Engineer
Oct 1990 to May 1991
Worked with Bajaj Auto Ltd., Waluj, Aurangabad
Job Profile
Managing operations at P.P&C. Department, press chassis & paint shop.
Indented Item code system and set Inventory levels for engineering items in engineering stores.

Future Goals


Seeking assignments in Production, Maintenance Operations & Project Management