M.B.A. HRD June- 2004 Mumbai Prin. L. N. Welingkar s IMRS First (63 )
B.E. Mechanical Engineering May- 1998 Mumbai MCT s RGIT First (64.65 )
D.M.E. Mechanical Engineering May- 1995 B.T.E., Maharashtra Govt. Polytechnic, Thane First (65.73 )
S.S.C. English June- 1992 Mumbai Saraswati Sec. School, Thane Distinction (83.28 )
Anywhere
Sr. Manager- Supply Chain Management
Since May 2007.
Presently working with leading manufacturer of Water Treatment/ Effluent Treatment plants 100 Cr. INR turnover.
Designation : Strategic Buyer (Regional Commodity Manager)
From February 2006 to April 2007
Husky IMS Pvt. Ltd., Powai, Mumbai
About Organization:
Husky is a world s largest Injection Molding Machines manufacturing company with US$1.3 Billion turnover. The company is a Canada based Multinational Company with offices all over the world.
Designation: Executive- Global Procurement
From October 2004 to January 2006
Siemens Ltd., Airoli, Navi Mumbaii-
About Organization:
The company is a German Multinational Company leads in various fields like Electrical and Electronics, Power Generation, Power Transmission and Distribution, Communication, Transportation, Infrastructure building etc. I was working in International Procurement Office, which assist all Siemens locations worldwide in procurement from India for various projects and as well as regular business. Main role was strived to procure goods from India ensuring customer satisfaction with timely deliveries, conformance to requisite quality standards, support logistic chain and competitive prices.
Responsibility:
Business Development- Customer base is Siemens worldwide and various other customers like Demag Cranes, Rile, FMA E1STermann etc.
Working out sourcing strategy from India according to demands. Working out commodity prices based on international prices of various commodity- downloads form LME. Also prices for regular business are based on previous exchange rates, raw material prices etc. on Pro-rata basis.
Enquiry stage- Provide overview of price structure, clarification of initial technical queries, floating enquiries and submission of price comparison with logistic cost.
Procurement of various commodities like castings, machined components, fabricated parts from India
Conducting negotiations and working out contracts with suppliers on behalf of customer. Preparation and analysis of vendor proposals and finalization of prices in Negotiation Rounds.
Planning the manufacturing schedules with supplier based on customer s requirements.
Set up logistic chain to ensure smooth delivery to customers.
Managed service support and logistics system with regular statistical reporting and improvement analysis.
Acted as a sole communication channel between customer and supplier.
Designation: Sr. Engineer- Assembly & Development
From January 2000 to September 2004
Precision Gears Ltd., Rabale, Navi Mumbai
About Organization:
The company is a subsidiary of IMA S.p.A., Italy. The company is engaged in the manufacture of packaging machinery required for the Pharmaceutical/Cosmetic & FMCG organizations.
Responsibility:
Resource Allocation, Supervision & Testing
Design modifications as per GMP & developments & project handling
Vendor Development (import substitutes)
Pre-sales activity & After Sales Support & service
Technology transfer from IMA, Italy
Coordination between dept- Stores, PPC, Inspection & Sales
Feasibility Study & Reports & machine building layouts
Value engineering of parts and localization. Cycle Time Reduction in the trial manufacturing line & ensures deliveries in JIT basis.
Trouble shooting of various technical problems at supplier s end related to machined parts, plastics, sheet metal parts, Electrical and Electronics products.
Development of tools and fixtures required for Manufacturing function.
Preparation of SOP & Validation documentations
Conversant with various standards- ASME, DIN, IS, BS, CE, GMP etc.
Production planning, Designing Micro Production plan / Daily-Weekly-Monthly, Priotorizing orders / Monitoring Critical orders, Material Planning & Analyzing Turnaround time for Material Planning, Designing material plan, Responsible for achieving Production Plan, Order tracking & Order Follow-up.
Experience in Project Management activities such as project planning at control & operational levels, material & resource planning, progress monitoring, costing & follow-up of material procurement etc.
Planning, reporting and cost controlling were part of my daily activities as well as coordinating & communicating
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com