B.E.MECHANICAL ENGG passed from C.I.T.Changa college in anand,dist-petlad.and passing from gujarat university from ahemdabad in year 2012 with pass class
H.S.C passed from gujarat secondary & higher secondary education board,gandhinagar in year 2006 to pass with first class.
S.S.C passed from gujarat secondary & higher secondary education board,gandhinagar in year 2004 to pass with first class.
MS office Knowledge.
Internet Knowledge
Senior Mechanical Engineer
From - 12 august 2022 to till date.
Company profile -manufacturing Bopet, Bopp, Cpp, Metalizer films etc
Senior Mechanical Engineer
From -7 february 2022 to Till date to 10 august 2022.
Company profile -manufacturing of BOPP, CPP, PVDC AND METALIZER FILMS.and BOPP Line
Job profile -
I am working as maintenance senior officer in mechanical department and I have to responsibility in all maintenance in Bruckner Bopp line 10.4,8.2 and 4.2meter and also Cpp 7.2meter line, pvdc,coating & Lamination and Metalizer machine maintenance.
I have to responsibility of Mechanical and Utility department in Bruckner Bopet line 8.5 10.4 meter, chillers, compressors, clct, open coolling towers,Ro plant and also Metalizer Maintenance,process chiller, Polycold chillers and compressors.
1000mm ROTOGRAVURE 10 Colour Printing Machine and 1000mm ROTOGRAVURE 9 colour Printing machine all Mechanical problem solved.
1000mm Laminated and Coating Machine all Mechanical problem solved.
1000mm Slitting Machine and Web Inspaction Machine all problem solved at that time.
10 Colour Lombadi Converting machine all Mechanical problem solved.
RITSTACK AND SYSCO Inmold Lable Cutting Machine and Mechanical problem solved.
I have to work responsibility Utility Department and Mechanical Department.
I have a work to HEATEX BOILERall parameters and programs as per required tempreture maintained and all maintenance of hearex boiler done.we have to number of 4 Heatex boiler 2500000kcal each one.
I have a work to Daikin chiller,Bluestar chiller, York chiller,Process Glycol chiller,Polycold chiller for used in metalizer machine general K5000 all maintenance and programs setting as per plant requirement and we have to number of chiller.
1.2- Daikin chiller 215TR,1- Daikin chiller 170TR.
2.1-Blue star chiller 200TR,4-Blue star chiller 115TR.
3.1-York chiller 100TR.
I have a working to ATLAS COPCO COMPRESSOR, KEASER COMPRESSOR And RECIPROCATING 2 STAGE AIR COMPRESSOR all parameters,service and maintenance to compressor.We have to required air pressure 7bar in oue plant.
I have worked to Air washer and Air handelling unit all maintenance,suction filtter cleaning,V-belt tension cheked,moter and blower aligenment and balancing, plumber block bearing greasing.
we have to two typs of cooling tower open loop cooling tower capcity 700 TR and closed loop cooling tower capcity 250TR each one clct and we have to six CLCT.
I have to work all Water treatment plant(WTP) areas pumps cheked every day. I have to responsibilities RO Plant,filtter Water tank,RoWater tank,Soft water tank,Softner tank and Sand filtter tank process cheked every days , Chemical circulation to RO Plant as per requirement for RO cleanning,Chemicals circulation for PH and TDS maintained for plant requirement.
Senior Mechanical Engineer
Form - 25/05/2021 to 31/01/2022.
MAKER POLY FILMS PVT LTD
Senior mechanical engineer
02/12/2016 to 18/05/2021.
SML FILMS LIMITED.
Mechanical Engineer
03/09/2015 To 28/10/2016.
Abdulrahman Abdulla Almansoori Contracting Co.w.l.l.
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com