Ref. No. : CA - 33442 - (Maintenance and Service - Dies & Tools – with 7.1 years in Plastic Industry)

Education

Diploma in Plastics and mold technology from (CIPET) Central Institute Of plastics engineering technology (2013- 2016) With an Aggregate 70%
Intermediate in MPC at Geetanjali jr.College affiliated to state board of AP. With an aggregate of 78.8%
SSC at V. Z. P. high school narayana puram Andhra Pradesh with aggregance of 77%

Skill Sets

Knowledge in 2d,3d Drawings
Auto Cad 2015
MS Office

Work Experience

Sr.Tooling Technician
From- June 2019 To Till Date
Company Profile- Manufacturer plastic auto components, Automotive Industries

Sr.Tooling Technician
From- 2018 to 2019 June
Company Profile- Manufacturer, Supplier & Exporter Of Precision Moulds & Dies, Plastic Injection Moulds

Job Profile-
Over all 5 year of experience in Mold making and Knowledge about mold Maintenance.
Tooling feasibility studies with design engineers of part details given by customers.
Mold design review for better mold manufacturing process.
Complete mold design studies with respect to machining process, mold assembly Process and technical issues.
Planning mold machining process, Tooling Process according to customer importance & Critical path method.
Interaction with in house tool room & CNC Machine shop for trouble Shooting While Mold manufacturing.
Sorting out tooling issues & giving solution to team members.
Trail attending, interaction with customers & troubleshooting in molds while trail run.
Part fitment checking, dimensions checking & Modification in Molds.
Customer Interactions in Implementing ECN.
Attending Mold buy -off trials & solving final issues of customer for dispatching molds after trails.
Molds buy off procedure & dispatch
Worked in 5-S way in workshop while manufacturing the molds
Installation & Commissioning the molds at customer place
Supervised a team 4 Members to ensure deadlines were met reached , and overall task accomplishment (shift lead)
Man power handling & training for a gradation
Preventive maintenance according to preventive schedule
Find the root causes analysis for mould breakdown issues
Perform maintenance of hot runner systems in moulds
Maintain the critical spares and perishable tools for all moulds
Attend the mould trails & Documentation follow up

Key Responsibilities includes :-
Knowledge about injection molding all plastic material knowledge
Injection mould design planning
Good knowledge in moulds concept
Assists with the development of work standards for tool pm
Performs all level of tool pm
Has knowledge of injection molding machine to safely work on mold while still in molding machine
IATF, Tooling Documentation, check List Analysis reports.
MTTR &MTBF, Preventive Action plan
Responsible for maintaining an inventory for the requirement of the supplier spare
Assessment of the required tools for the maintenance of the equipment
Analysis of tool breakdown failure
Responsible for maintaining and repairing heavy equipment required in the day to day working.
Assint in the preparation of evaluations and reports
Adopt and implement a detailed maintenance plan to minimize failures resulting in stoppage work
Responsible for performing routine maintenance
Mould planning for preventive maintenance
Online problem solving
Blue matching
Hot Runner system trouble shooting
Spares Maintain
Flash correction
Mould cooling system
Lifters, ejector pads Height maintain
Fixture, trolley pm
Mould electrical, hydric functions
Respond to facilities maintenance requests made through online submission and correspond with team or manager via email
Suggest improvements to work methods
Monitor daily on-site operations to identify and solve day to day technical operational problems
Assist in the cost reduction Activities, and process improvements

Trainee
From- 2016may to 2016 Oct
Premier Tools


Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com