Pursuing B.E (Mechanical) From Indore Institute Of Science & Technology, RGTU, Bhopal in 2013 with 73.4
B.E. From Indore Institute of Science and Technology, Indore an authorized study center of RGTU, Bhopal, with 73.41%
H.S.S.C. From Gyanodaya Vidyalaya, Indore with 81.1%.
Production Planning And Controlling, 5 S, Fishbone Analysis, Why-why Analysis, Ms-office Excel, Mis Reports Preparation, Manpower Scheduling, Planned And Preventive Maintenance Scheduling, Wastage Control.
Good knowledge of FIBC (Flexible Intermediate Bulk Container) for Production Planning
Control and related Production activities.
Familiarize with various management techniques like 5S, KPI &KRA analysis, Why-Why & Root Cause Analysis & good command in document applications.
Production In Charge
Since Jun 2017
Company Profile: Leading manufacturer of Big Bags, Tarpaulin (Tarp), PP Fabric, Flexible Intermediate Bulk Container (FIBC), Baffle Bags, Builder Bags, PP woven sacks.
Senior Production & Planning Officer
Nov 2016 to Apr 2017.
Company Profile : Leading Manufacturer of P.P. bags
Production & Planning officer (Extrusion & Weaving)
Jul 2014 to Oct 2016
Company Name : Neo Corp International Limited
Company Profile: Leading Manufacturer of Fibc.
Key Skills :
Prepare MIS for fabric planning as per Container planning as per available orders in our organization.
Production date plan according to available resources & machinery.
Plan materials according to container dispatch plan (Like fabric, accessories, purchasable secondary raw materials & any consumable things).
Production Reports of all departments, like this Extrusion, Weaving, Finishing etc.
Prepare the general and preventive maintenance schedules for the various machineries in the organization.
Co-ordinate with Marketing.
Inventory Control & reduction in wastage of the organization.
Ensures that the principle of 5S and safety standards are adhered to on the shop floor.
Handling all activities pertaining to Production Planning & scheduling.
Improve the working process and standardize the process and procedure.
Time standardization.
Maximum utilization of Manpower, Machinery and Materials.
Grading the operators depending upon their capacity and skill matrix.
Documentation of Daily efficiency, Monthly efficiency and style wise deviation.
Develop innovative ideas and alternatives to be cost competitive with proposal.
Project Undertaken :
Major project on “Hydraulic tube bending machine” for Indore Institute of Science and Technology-II, Indore as Major Project for B.E.
To obtain a challenging position working with a team of professionals in a highly client-focused environment that utilizes my technical, management, and communication skills to add to the overall success of the organization.
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com