Ref. No. : CA - 16529 - (Production - Dies & Tools – with 11.1 years in Plastic Industry)

Education

Pursuing One Year Part Time Diploma In Plastics
From Indian Plastics Institute (2015-2016)

B.E. Mech from G S Moze, College of Engineering, Pune in 2013 with 61.26% First Class

HSC from R.J.College,Mumbai in 2008 with 73.83% First Class

SSC from Sandesh Vidyalaya Mumbai in 2006 with 82.12% First Class With Distinction

Skill Sets

CATIA  V5R19
AUTOCAD  2010
MASTERCAM  X4
HYPERMESH  11.0
UGNX  7.5

Keen  listener  &  have  good  grasping  ability.
Make  the  decision  and  work  to  make  them  correct.
Good  Interpersonal  Skills  &  human  relations.
Sincerity  &  punctuality.

Work Experience

Tool Room Supervisor
Since March 2014 
Company Profile: Leading manufacturer of Multi cavity Pet Preform Mould For Bottles (Upto 25 Ltr) And Jars, Hot Runner System and modular assembly for high Technology. 
Job Profile:
Heading all the Tool Room activities. 
Operating all the Machines, Developing setting time of machine fixtures, Jigs, Gauges and special tools, CNC setting And Programing.
Preparing machining drawing, Maintain machine operators to get production every day.  
Maintain production notes, Quality documents and parameters. 
Incoming Material and Process Inspection and finalizing the finished production parts before moving to quality department.
Follow up with the technical team to make sure that queries are solved.                          
Ensure to follow up cost management and time to the respective project.
Thorough involvement for mould assembly, mould and Hot runner maintenance and final trial on molding machine.
Monthly inventory and stock maintenance.
Strictly follow safety precautions at working environment.
Thorough involvement for new developing products.                    
Design And Modification Of Ball Valve Test Rig
6 months
Company Name: Del Valve Flow Controls India Pvt Ltd.
Company Profile: “Design And Modification Of Ball Valve Test Rig”
Job Profile:
In the world today there is a need for increased productivity and shorter lead time.
My project deals with such a situation. My project is about designing a automated "Ball Valve Test Flange and Clamping System ". 
Traditionally for every change in class and size of Ball Valve, different flanges were used. This increases lead time of testing and fatigue of operators. Universal Flange is able to replace all the traditional flanges. This flange has more sophisticated clamping system which makes it unique
Team Size 4 members

Perusing One Year Part Time Diploma Courses In Plastics
From Indian Plastics Institute (2015-2016)
Catia V5r17 Certificate from Vast Engg Solutions.
Pgdams: Training Program of Advance Mechanical System with PROLIFIC
Hydraulic and Pneumatic System
Compressor and Pumping System
Instrumentation, Scada And PlC 
Condition Monitoring, Vibration Analysis and Dynamic Balancing

Extra-Curricular Activities:
Committee member of Mechanical Engg. Students Association and Co-ordinater of various technical events organized in the G S Moze College of Engg. 
Participated in many Robotics Competitions.
Successfully organized Blood Camps, Farewell function, Traditional day and Cultural functions.

Future Goals

To work with an organization, where I can prove my potential and enhance my skill for the betterment of my career as well as the organization.

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com