Ref. No. : CA - 17304 - (Production - Moulding – with 20.1 years in Plastic Industry)

Education

Diploma in Plastic Technology in 2004 With 76%

Skill Sets

Knowledge in Yushin and witmann robot
Knowledge in clean room management, laser cutting and foil feeder mechanism
knowledge in recycle extruder and vacuum forming
Knowledge in baby plast, in mold decoration, Double shot mold & insert mold
Knowledge in 5s, Kaizen, Kanban, Jit, Fmea
undergone to Beijing trip in china through my past organization for
Supporting our Beijing plant development process

Work Experience

Shift In charge
Since May 2014 
Company profile: Pipe and Fittings Manufacturing
Job Profile:
Responsible for shift production planning & control.
Optimize man, Machine & material & utilization to achieve present production target
Maintain the quality of products with right quantity during production.
Plan the change over as per the demand or order
Monitoring process activity & motivating people for achieving result.
Troubleshooting program in molding
Trail establish the new mold & product
Planning for consumable parts spare required to achieving monthly plan productivity
Conducting new trials for master batches& new raw materials.
Troubleshooting of the various faults occurred in the machines.
Responsible for fabrication products such as long bend, over bridge bow & Belling

Production Engineer 
May 2007 to Mar 2014
Company profile: plastic components for electronic parts manufacturer 
Job Profile:
Handling shift responsibilities.          
Managing manufacturing programmer in terms of quality & production norms.
Following the KPI target.
Prepare the action plan, KPI reports & workers evaluation report etc.
Handling raw material consumption & day-to-day requirements.                  
Controlling rejection on daily basis.     
Organize the post molding operational steps at various levels as per requirement.   
Manpower utilizing at the maximum.             
Responsible to execute production as per plan.
Material planning and indenting.    
Analysis of loss of production and reports submitting to management. 
Implementation of ISO standard on shop floor & prepare working instructions.
Daily review of production & rejection.Focusing on optimization of process parameters and initiating process improvements for achieving top line objectives and productivity targets.

Production Supervisor
May 2007 to Mar 2014
Company Name: Saber Pens Pvt Ltd
Job Profile:
Key person for planning for optimum utilization of manufacturing resources to meet the expected profitability through targeted productivity and continuous cost reduction initiative
Monitoring process activity & motivating people for achieving result Responsible for Production, Quality, Cost, Delivery & Safety Responsible for derive process setup & mold setup for new projects.
Responsible for control over rejection during process Daily monitoring of Hourly production report
Daily monitoring of in house ppm &OEEE
Making process validation plan & done as per plan.
Handling the customer complaints & find the root cause by using quality tools.
Cycle time, Cost and Manpower reduction

Trainee Supervisor 
Dec 2004 to Nov 2005
Company Name: Jai Balaji Pvt Ltd
Company Profile:
Job profile:
Execution of completion of targets in co-ordination with shift officers.
Responsible for Production, Quality, Cost, Delivery & Safety. Responsible for Handling of Quality Department. Responsible for Customer Complaints and analysis. Trial of different Materials & Molds for new Developments. Production Planning related to mold shop against customer requirements.
Analysis & Action plans on monthly internal rejection trends. Optimum utilization of Manpower, Machines & Resources.
Raw Material Reconciliation
ISO Documentation, SOS and PMS Sheet Maintain after Mold change when ok part is running in eachshift.
Minimizing The Possibility Of Machine Break Down By Timely Intimating Maintenance Department.

Infant Trainee 
May 2004 To Oct 2004
Company Name: Royal King Pvt Ltd
Job Profile:
Mold loading & unloading
Process set up
DE flash& packing works
Daily preventive maintenance
Grinding and mixing works
Daily production report writing

Future Goals

.......

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com