Post Graduate Diploma in Plastics Processing & Testing (PGD-PPT) From CIPET (APPTC Balasore) in 2015 with 71%
B.Sc From Nachuni Mahavidyalaya, Nachuni, Khurda, UTKAL University, Orissa in 2012 with 56%
12th From Kandakhai College, Bajrokote Puri, C.H.S.E, Orissa in 2009 with 52%
10th From Gopinath DEV Vidyapith, Puri, B.S.E, Orissa in 2007 with 59%
Plastic Processing: Injection molding machine handle.
Ferromatik Milacron ( 80T - 660 T)
TOSHIBA (100T – 350T)
ENGLE (120T - 400T )
HAITAN ( 100T - 1300T)
Super master (90 T-850T)
Electronica (160 T-350 T)
KABRA intermittent extrusion blow molding machine ( 5 liters)
C M P extrusion blow molding machine ( 5 Liters)
Plastic testing:
Product Testing
MFI (Melt Flow Index)
HDT (Heat Distraction Temperature )
Computer Knowledge
P.G.D.C.A
Internet applications
Operating system like Windows 7, 8, XP etc.
Production In charge
Since Oct 2016
Company Profile : Engaged in manufacturing of metal moulding, plastic moulding, plastic moulded components and plastic moulded automotive parts.
Production Executive
Feb 2016 to Oct 2016
Company Profile : Manufacturer of Plastic Injection moulds (upto 2008T moulding machine) and Blow moulds
(up to 200 litres capacity).
Production Engineer.
Jan 2015 to Jan 2015
Company Name : Global Autoplast Industries
Job Profile :
Production planning as per customer requirement.
To ensure the availability of stock as requirement.
Process setting for new mold and material.
Handling all shop floor activities like shift handling, mould change, process problems.
Awareness and implementation of 5S & Kaizen on the shop floor.
Productivity improvement by cycle time improvement.
Process validation for reducing in process rejection.
Updating machine and mould history card.
Provide technical coaching to production employee.
Daily Activity
Check the production report and reporting to plant head.
Preparing production planning.
Calculate OEE and take action to improve the same and archive the target.
Daily arrange D W M meeting.
Maintain record like as production report, QC inspection report and problem/corrective action logs etc.
Maintain 5S activity daily.
6 Month Industrial training completed at Previous company in Injection molding and Extrusion Blow molding.(05.06.2014 -28.12.2014)
Interested Area:-
Injection Molding.
Machine Maintenance.
To find a job opportunity which provides a platform to enhance my skills and utilize them for my professional growth and thereby contribute to growth and development of the organization I am working with.
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com