Ref. No. : CA - 18432 - (Production - Moulding – with 17.2 years in Plastic Industry)

Education

B. C. T (Bachelors in Chemical Technology) from Dept. of Chemical Technology / Engineering,
University of Karachi, Pakistan in 2002 To 2005 With 1st Division

H. S. C From Pre- engineering, D.J Government Science College in 2000 To 2001 With 1st Division

S. S. C Science From St. Paul’s English High School in 1998 To 1999 With 1st Division

Skill Sets

Skills and Courses:
Pet Preform Molding Course (v7.1)
HyPET HPP 4.0 Operator Course (v1.1)
HyPET HPP 4.0 Maintenance Course (v1.2)
(These courses were conducted by Husky Qualified Trainers in Novatex Plant).

Internal Auditing training.
Training on awareness to ISO 9001:2008.
Training on awareness to HACCP.
(The above mentioned training were conducted by United Registrar of Systems URS)
Good command over written and spoken English.
Have strong communication and interpersonal skills.
Well versed in Microsoft Office Applications

Work Experience

Injection Molding and Blow Molding Plant, PET Preforms and Bottles
Since Apr 2015
Company Profile: Injection Molding Plant, PET Preforms
Job Profile:
Additional responsibility of ISO- Coordinator and HACCP team leader.
Responsibility is to coordinate with URS consultant for implementation of ISO 9001:2008, and HACCP
Responsible for smooth production and maintenance of machine and mold.
Trouble shooting of machine and preform visual and non - visual defects.
Correspondence with Technology blow molding department for trouble shooting of bottles.
Supervise mold change over.
Maintaining important spare parts stock for machine.
Coordinating with Mechanical and Electrical technicians to solve machine issues.
Coordinating with Husky Service Engineers in case of need.
Generating all production reports.
Generating Monthly reconciliation reports.
To execute production plan given by Marketing department.
with additional responsibility of ISO- Coordinator and H.A.C.C.P team leader.
Responsibility is to coordinate with URS consultant for implementation of ISO 9001:2008, and H.A.C.C.P.

Shift In charge in Injection Molding Department
Mar 2007 To Apr 2015
Company Profile:Comprising total of eight Husky Injection Molding Machines HyPET 300, HyPET 500, HyPET 400 HPP 4.0 Design by Husky Injection Molding Systems having head office in Luxembourg and Single Stage Bi Axial Injection Stretch Blow Molding Machine design by ASB Japan. Auxiliary equipment such as Resin Dryer, Mold Dryer, Resin silo and Resin Loading systems design by Piovan Italy and Plastic Systems. Injection Molding Plant consists of variety of 72, 96 and 144 cavities molds ranging from 14 gm to 52.5 gm.
Job Profile:
Enthusiastically, Participated during Erection and Installation of Injection Molding Machines.
Experienced in uploading mold set-ups, calibration and installation of molds.
Expert in operating Husky Injection Molding machines HyPET 300, HyPET 500 and HyPET HPP 4.0 machines as outlined in Standard Operating Procedures.
Anchored project of installation and commissioning of HyPET 400 HPP 4.0 machines with Husky Engineers.
Experienced Trouble shooter of Husky Machines, Molds and Preform visual and non- visual defects.
Have complete knowledge of plant Health & Safety Rules/Policy, including use of all required personnel protective equipment.
Job Profile:
Responsible for mold set-up and to operate Husky machines as outlined in Standard Operating Procedures and to ensure all guards are on machine before startups.
Responsible for supervising maintenance of molds and machines.
Follow all plant Health & Safety Rules / Policy, including use of all required personnel protective equipment.
To execute production plan given by Marketing Department.
Trouble shooting Husky Injection Molding machines.
Respond to all process Alarms, Monitor and respond to all analyzer and laboratory test results.
Responsible for quality and accuracy of finished preforms produced.
Responsible for plant cleanliness, safe storage of preforms and organization of product.
Lead and participate in process improvement initiatives.
To generate complete reports including all production reporting and troubleshooting reports.
To ensure plan changeovers completed as per standard.
To ensure downtime is minimized by ensuring proper equipment setups, material present prior to changeover and report lack of raw materials, tooling and / or equipment issues to the appropriate personnel.
Optimization of cycle time of machines.

Achievements:
I am selected as shift in charge production among twelve trainee engineers production.
Successfully developed procedures to optimize waste and to achieve a target of 98.7% A grade production.
Selected to anchor the installation and commissioning of HyPET 400 HPP 4.0 machines with Husky Qualified Engineers.

Future Goals

............

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com