I.T.I. From N.C.V.T. in Year Aug 08 With 74.14%
H.S.C From G.S.E.B. Gandhinagar in Year 2003 Pass
S.S.C.From G.S.E.B. Gandhinagar in Year 2001 Pass
M.S .OFFICE With Internet & ERP Quality module, SAP R/3 version
Specialty:Knowledge In All Pipes- Lldpe, HDPE, SWR, UPVC, CPVC, MDPE, And All Drip Irrigation Projects
Production & Quality In Charge
Present
Company Profile: Service Provider of Commercial Services, Drip Irrigation Services.
Extruder Machine Operator.
Since 1 Year
Company Name: 3m India Ltd
Lab Assistant Cum Field Officer
2 Year Experience
Company Name: Parixit Industries Ltd
Quality & Production Manager
2 Year Experience
Company Name: Sujay Irrigation Pvt. Ltd
Production & Quality In Charge
2 Years
Company Name: Jet Irrigation Pvt. Ltd
Job Responsibility As A Production In Charge
Production Planning.
Man Power Planning.
Purchase Planning.
Product Development.
Document Development.
Attend All Type Visit Lick Bis, Iso,gwssb,vasmo,cipet,
Job Responsibility As A Quality
On Line Checking & Testing Emitting Pipe As Per Is No.13488.
On Line Checking :
Measuring To Wall Thickness Of The Emitting Pipe At For Point Equally Spaced.
Measuring To Inside Diameter Of Emitting Pipe Insert In To The End Of The Pipe A Specific Taper Gauge.
Measuring To Spacing Three Spacing Of Emitting Unit Accurately
Flow Rate As Per Is. 13488
Marking And Packing :
Name Of Manufacturer Or His Registered Trade Mark.
Year Of Manufacturer
Batch Or Code No
Flow Direction Effect Operation Of Emitting Pipe
On Line Checking & Testing Upvc Pipe As Per Is No.4985
Measuring To Wall Thickness Of The Upvc Pipe At For Point Equally Spaced.
Measuring To Outside Diameter Of Emitting Pipe Insert In To The End Of The Pipe A Specific Pie Tape.
Measuring To Reversion Three Sample Of Upvc Pipe Unit Accurately
Impact Strength As Par Is:4985
Hydro Test As Par Is:4985
Opacity As Par Is:4985
Marking And Packing:
Name Of Manufacturer Or His Registered Trade Mark.
Year Of Manufacturer
Batch Or Code No
Flow Direction Effect Operation Of Upvc Pipe
On Line Checking & Testing Sprinkler Pipe As Per Is No.14151
On Line Checking & Testing H.d.p.e Pipe As Per Is No.4984
On Line Checking & Testing H.d.p.e Pipe As Per Is No.14333
On Line Checking & Testing Plain Lateral Pipe As Per Is No. 12786
Maintain The All Book And Record As Per Bis Requirements.
Specialty:Knowledge In All Pipe Lick Lldpe, HDPE, SWR, UPVC, CPVC, MDPE, And All Drip Irrigation Projects
Expiring new vistas with an organization which offer me constant leering and utilization my potential and skills to the filets in what whatever filed I am working
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com