Ref. No. : CA - 14403 - (Production - Extrusion – with 17.4 years in Plastic Industry)

Education

DEE-III from SMT. P. C. P,. Karad, MSBTE in 06- 07 with 65.46%

HSC from Yeshwant V. Kokarud, Pune, in Feb 2004 with 56.67%

SSC from N .D.M. V. Meni, Pune, in March 2002 with 62.13%

Skill Sets

Key Skills
Operating of cable Extruder machine.
Autonomous maintenance.

Work Experience

Production Supervisor
April 2013 till date
Company Profile: Manufacturer of quality products as Drip Irrigation.
Job Profile:
Responsible for man power handling.
ERP System Operating in Ramco ERP.
Instakit assembly and Leaser Puncher m/c Planning.
Drip Irrigation Extrusion related problem solve and Achieving Target.
Commissioning of Drip Irrigation Extrusion, Leaser Puncher & Packing Station, Set up.
Observation of Leaser Punching Hole Size, Tube Thickness, Printing etc.
Raw Material, Consumable Atoms & Stationary Stock Maintain in Drive.
Checking recepy for Material Mixing, Oven Temperature & Machine Related Problem Solve.
Material-LDPE, LLDPE, GMS, MB, etc.

Key Skills
M/c Planning and shift manpower handling.
Technical work and hard work capacity.
Good communication and Target Achievements.
ERP, SAP, TPM & KAIZEN Improvement.
Operating Drip Tubing Extruder machine & Training all Operators.

Shift- Incharge. (Production)
March 2011 to March 2013
Company Profile: Leading plastic processor making quality products as Foam, XLPE Foam, cap-cell sheet, furniture, NBR tube, plastic Raw material.
Job Profile:
Responsible for man power handling and LPG gas tank monitoring.
Extrusion line related problem solve and planning.
ERP Operating for Raw material consuming in store system.
Commissioning of foam Extrusion, Lamination, RPP m/c.
Extrusion Tools audit and observation.
Observation of foam Extrusion and manpower handling.
Checking recepy for XLPE, foam and ABF.
Manpower handling for production operation.
Material-PE, LDPE, GMS, SW, TALC, UV2, SPL, etc.
Key Skills
M/c Planning and shift manpower handling.
Technical work and hard work capacity.
Good communication and Target Achievements.
TPM Improvement.
Operating of Foam, Tube & ABF Sheet Extruder machine.

Officer - Production & Maintenance
Nov 2007 to March 2011
Company Name: Cable Corporation of India Ltd.
Company Profile: An ISO 9001 Quality Management System certification from BVQI, having a very wide product range for power/ control cables ranging from 250 V to 230 kV. The Company is exclusive licensee of Siemens A.G. Cable trade names in India and Company is controlling about 21% of the organized power cable market in India.
Company has successfully exported its quality products to South Africa, Sri Lanka, Bangladesh, Mauritius, Kuwait, Singapore and other countries.
CCI was the only company in Asia to have the technical collaboration with Mitsubishi Cable Industries of Japan for the MDCV process for manufacturing EHV XLPE cables with rights to patent & know how and rights to sell these cables anywhere outside Japan.
Job Profile:
Responsible for MDCV Machine operation and Autonomous Maintenance
Worked in electrical maintenance during EHV plant project.
Project: Commissioning of MDCV, outer sheath, Lead press, Taping m/c.
MDCV Tools audit and observation.
Operation for production of 66kv, 64/110kv,132kv, 230kv (EHV cables)
Manpower handling for production operation.
SAP System Operated & Spare parts arrangement at Plant Project time.
Troester cross-head commissioning and operation.
Nokia Mall filer Extruder Operated and 150 j K Extruder line Operated individually.
Steam, oil heating and tool fitting to cross-head.
Machine running time parameter readings and observation.
Material: PE - Insulation, Lead, HDPE- Outer sheath.

Company Training
Internal Quality Auditor - 10 Days
Fire Fighter - 03 Days
Safety - 07 Days
Making SOP for production and Machine Operations & Tools assembling - Training provided by Consultant from Canada.
Implementation of 1S to 5S, Kaizen, TPM & one point analysis. Preparing and developing pre plant startup checklist. Raw material and machine / manpower planning.

Company Training
Internal Quality Auditor - 10 Days
Fire Fighter - 03 Days
Safety - 07 Days
Making SOP for production and Machine Operations & Tools assembling - Training provided by Consultant from Canada.
Implementation of 1S to 5S, Kaizen, TPM & one point analysis. Preparing and developing pre plant startup checklist. Raw material and machine / manpower planning.



Future Goals

I want to pursue a promising career that provides adequate space for my creative competence. I want to fulfill my social and personal responsibility.

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com