B.B.A from Perunthalivar Kamarajar Arts College, Madakadipet
in 2007-2010 with Second class
Hr. Sec from Vivekananda Govt Hr.Sec. School, Villianur, Puducherry.
in 2005-2007 with 57.04%
S.S.L.C. from Perunthalivar Kamarajar Hr.sec School, muthialpet
in 2004-2005 with 52.%
Technical Qualification
DCHN (Diploma in Computer Hardware and Networking)
DCA (Diploma in Computer Application)
SAP (Production & Quality)
Production Supervisor
Since Nov 2014
Company Profile: Manufacturer of LDPE, LLDPE, HDPE Multilayer monolayer Products with Roto Gravure printing
Job Profile:
Planning, Production, on line Quality checking. Production of Flexible Packaging Blown Polyethylene film Materials used for foods grade, Detergent Powder, Detergent Cake, shampoo.
Working in Multilayer Blown film extruder machine. (Both IBC or Non IBC), (Rajoo Extrusion - Model-RECF-2360-75/2400 IBC, output-400kg/hr).
Machine Type Three layer - IBC Blown Film Line (Nip with Auto Splicing 1 & 2)
Manufactures of 2200 mm maximum blown film width, three layer Blown Film Extrusion machineries Output 400Kgs/ hr, Kalimata machine 1200mm maximum Blown film width, three layers Blown film Extrusion output 100 kgs /hr.
Able to read machines, schematic drawings, preventive maintenance of D/C motors, Pneumatic system. Ability to train new extruder operators & guide them in solving machines break downs efficiently & effectively.
Able to distribute work assignment to his subordinates, train them & get the highest possible efficiency .Prepare production plan and shift schedule & submit to Asst Factory manager for approval.
Verify the correctness of the daily Production log Sheet records & submit the final report to the Asst Factory Manager.MIS Report Preparation for our head office.
Having technical knowledge of plastic raw materials (LLDPE, LDPE, HDPE, PP, WMB) technical & physical properties.
Quality checking of Extruded natural film, milky film, Maintaining of Quality Testing in the film GSM, Dart impact Tester, COF Tester, and Checking of film Size in mm. Quality maintaining in finished goods. Prepare sample for future reference.
Attending the Process troubleshooting during Production. Proper Technical guiding to Down line People. Online Process maintenance of Extruders like Die opening, Air ring Cleaning. Handle Extruders machines for executing of Production. Note down Process Parameter in the log sheet as per shift wise.
Production Supervisor
Sept 2013 to Nov 2014
Company Profile: LDPE, LLDPE, HDPE Multilayer monolayer Products with Roto Gravure printing
Job Profile:
Line Checking Product handling
Material sampling
Materials to be kept as per the quality status (Accepted, Pending, Rejected)
Packing Material Checking Printed Lami (Printing Text Matter & Artwork, GSM, Seal Strength, Thickness
Dispatch as per the required
Daily production to be completed as per the requirements
Manpower Arrangements
Quality Assistant
August 2010 to September 2013
Company Name: Pioneer Detpack
Company Profile: RIN powder packing
Job Profile:
Quality planning
LQC (Manpower )handling
Line Checking Product handling
Material sampling
Material Bulk density & DFR checking
Materials to be kept as per the quality status (Accepted, Pending, Rejected)
Packing Material Checking Lami (Printing Text Matter & Artwork, GSM, Seal Strength, Thickness)
Packing Material Checking SACK &POLY LINER
AD & Moisture Checking In Lab
SAP entries
Quality Clear In SAP
Packing Materials, Semi Finished Goods, Finished Goods Qc Cleared
QC Reversal, Ticket Rising
Production Booking & Cancelation
Production
Checking the Qty and the Rate Defined as per the PO
Checking whether Purchase Order, available for the material received in factory
Manpower Arrangements
Daily production to be completed as per the requirements
Preparation of Daily stock statements
System stock and physical stock checked and matched daily.
Ensure the material quality status by the quality control dept
Dispatch as per the required formulations
Working Instructions and Training to the labors
Labor Safety training
Planning
Auditing
Preparation of statements and clarifies the doubts and Queries raised by auditors.
Project Work
Title: Tour and Hotel Project
Description: This Project was developed to hospitality and tourism.
Training for hotel industry 45 days & tour project in 10 days
Desires an opportunity to move into the excitement of the Management position myself so as to utilize my technical knowledge for the accomplishment of the goals of a growing organization which in turn would lead to a challenging career as a Professional
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com