PGD
OTHER EXPERIENCE
Basic Knowledge of Computer
Computer Concept Course (CCC)
Award the best Employ Runner a Position
Best Suggestion Award
Participate Monthly Quality Circle
Tool Room Engineer & Production
From 2019
Company profile- manufactures pharmaceutical plastic packaging products.
Job profile-
In Production Field Working Injection Moulding Machine Tool Loading and Unloading MTC Connection Chillar Connection and HRTC Connection Process Setting Without Parameter and With in parameter (both) in Trial Molde Making SMC Parameters AISOPS and Solved Problems
Technician (Production)
From 02/10/2016 to April 2019
Company profile- automotive company based
Job profile-
Tool Loading and Unloading and Connecting cooling channel with in 15 Minutes 60 Ton to 300 Tom Machine Like Toshiba, JSW, Fanuk, Angle and H.M Series Hydrolic and Troggle Type Machine
Process Setting in Machine and Setup we are following Global Standard (Japaneis Process)
Row Material Handling Process Setting Time For Nylon PBT PP Peak ABS and Many Types and 15 Types Grade Row Material
Observed many Types Problem like that Short Shot beld line Falsh Bubble Silver Srinkage and Flowmark During Process Time.
Maintain 5S Process T.P.M Kaizen Process and Quality Control (No.1 Company Pika Pika Activity in All Over World 98.4 %)
Main Power handling and Machine handling 60 to 50 Manpower Handling in My Company
Experience in Production and Quality
PROCESS SUTTER OR TOOL SUTTER (Production Department) Fine Tools
India Pvt. Ltd
Bangalore Penny 2nd Stage Aug 2015 to Jan 2016
Job profile-
Process Setting : Tool Loading and Unloading Complete work after as per Carefully Mold Locking Use has Per Process Meter did not match Process parameter Setting Own Parameter and Customer Requirement .
Machine Handling for Process Setting :-Nissalpe 201 Tof June 201, nissaipe 80T, Toshiba 100T, Nssalpe 125 T, Toshiba 275,Ferromatic 300T, Toshiba 350T, Toshiba 400T, Toshiba 550T, More than this company 46 Machine handling Tongle system and Ram System
Process Setting time Row material handling :- Main grade Row material PP Pom ABS Acralic PC HDPE LDPE Nylon tolk Field and glass field
Process Setting adsorb Point:- M/C Condition Plan for mold Loading Mound Loading use for rod of coupler use for row material suppose Pre Heating row material Use Correctly Observed MTC Water Base or Oil Base or chiller and completely observed time.
M/C Running time avoid Problem :- Silver sticks White peach burn Mark Falsh mark flash dimension, short Fill bubbles color change water mark daunt mark Black dots avoid short weight low or shor t weight high.
Process Setting tine handling Mold :- Cold spure mold and hot sprue mold (hrtc) hafe set mold and full set mold Air blow, 3 Hydraulics Core Mold.
Responsible:-Responsible work for document maintain and operator typing.
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com