B.Tech
IT Skills
Well versed with MS Word , Excel, Power point and MIS on Google Drive
VISI 3D Modeling and Auto Cad
Well knowledge of CMM.
knowledge of Delcome power mil for vmc programming
Tool Room Manager
From Nov 2019 - Present
Company profile - Made Bathroom Cistern, Seat Covers, PTMT Taps, Jet Sprays, Bathrooms Showers, Hand Showers, etc.
Job profile -
Lead Team, Design Review, Vendor Development, Product Planning control, Mould Maintenance and PM, R&D and Quality
Tool Room Head
From Jan 2014 - Oct 2019
Company profile - Engaged in manufacturing, supplying and exporting of Material Handling System.
Job profile -
Lead Team, Mould Review , Vendor Development, Production Planning control,
PPAP, VMC Programming , VMM, CMM, and Quality
Kd Engineers And Technologies
Specialization in Medical and Automotive Mould Manufacturer
Career Growth Path;
Tenure 04yrs. (Jan 2010- Jan 2014)
Designation : Tool Room Engineer
Role : Lead Team, Mould Design ,VMC Programming , VMM, CMM and Quality
Mediplus India Ltd
Medical & Surgical component manufacturer
Career Growth Path;
Tenure 2.5yrs. (July 2007- Dec 2009)
Designation : Tool Room Machine operator
Role : Lathe, S/g, C/g, M1TR, EDM, Tool Cutter, Profile Projector
Key Functional Areas;
Maintenance
Performed a variety of general maintenance, alteration & repairs to equipment, machinery in accordance with standard procedures, diagram, or manufacturer instructions.
Maintaining all machine& Mould pre maintenance records according to the period of maintenance.
Monitoring the status of periodic maintenance
Preparing asset registers and making proper adjustments with respect to depreciation.
Attended History of all types of mould& machine breakdown
Manage & Record cost of maintenance or repair work.
Cost Reduction and Increase Productivity through Preventive Maintenance, Predictive Maintenance, analysis & Use latest equipment Kaizen
Manufacturing
Preparing the day to day future planning of work strategy
Monitoring the all operator work status and analyses the work efficiency
Estimate the sufficient time for finalization of job
Estimate machine process and handling of work
Lead the team in the sufficient work strategy
Continuously measure and evaluate the departmental goals and all work processes
Solving all problems with the best decision.
Vender Development
Interfacing with Internal/ Statutory Vendor and providing them with all necessary work knowledge.
Ensuring timely delivery and timely receiving from them .
Liaoning with vendor to Cost, Quality ,Time and maintain comparison sheet.
Audit to measure the feasibility .
Training and Motivation
Motivate to do work as a team and keep in mind company goals.
Motivate to give importance and interest with your work .
Self Provide Training regarding the work , discipline and 6s
Provide all necessary support to other dept.
Conduct internal audit of other department.
Design
Design the Medical Mold like I V Cannula .
Design the Automotive Mold like Headlight .
Design the Sanitary items Mold like Taps and Faucets
Design the jig and fixture.
Calculation all tool making cost and achieving time
Outlet the drawing according to the machine process
Design the Time Plan for all tools
Forecast new tools by using last experience and new improvement
Quality
Keep the Inspection Report of all tools .
Monitoring the all inspection report and analyses the against NG points.
Precision Quality controlled by Tool maker microscope , VMM, CMM
Use of Quality tools like MSA,PPAP
Administration
Maintain 5s.
Promoting a positive health and safety culture on site.
Calculation the cost of per machine and man power
Maintain the record all inlet and outlet material
Conduct the Periodic Safety and Process Audit .
Conduct Process and System Audit of Internal Departmental per month
Professional Profile
Resourceful in managing day-to-day future work planning including finalization of period of wok.
Keep record of all work activities, costs & preventive maintenance.
Team Leader with excellent analytical and communications skills.
Continuously measure and evaluate the departmental goals and all work processes ? Improvement Productivity time to time to analyze
VA/VE Approach implementation to Achieve Cost reduction Targets.
Increasing profitability by eliminating Wastes. Cost Reductions. ? New Product Development- actively involved in the development of new component.
R&D- Development of New models as per the Customer requirements.
Problem Solving- solved the problems of product quality with detailed analysis and through team approach.
Development of New products, their approval and implementation for the overall satisfaction of the customers.
Lean Manufacturing trainings and its implementation.
Kaizens- Implementation to improve cost/quality.
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com