Ref. No. : JA - 5818 - Asst. Manager / Sr.Engineer – Production - Moulding at Plastemart Jobs, Banglore

Job Description

Moulds are loaded as per plan & production executed
Man Machine management
Work Instruction for the mould are available on the Machine
Process is set as per Approved PDC
Components are running as per standard cycle time – productivity or better
Cleanliness of the Work area
Ensuring ERP system whether properly filled and to be monitored
Material loading cards are filled & monitored
Ensure the mould loading and start up is done within the allocated time
Get the Deviation request approved for such components which are running out of specification as required
Corrective and Preventive action for NC products.
Communication Log book is entered
Submission of the following reports, Completed & filled Material card, CAR report, Document change request for Process related activity.
Mould trials and completeness of the Document / Material reconciliation
Maintain the shop floor spares, tools, clamps, nipples, water hoses, lifting tackles, studs, nozzles, ejector rods.

About Company

A premier moulding house for rigid plastics packaging and engineering components.

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com