Post Graduate Diploma in Plastic Testing and Conversion Technology From CIPET, Madras
B.Sc. (Chemistry, Physics, Mathematics) From Berhampur, Orissa
Lead Auditor Training Programme attended by CII, Bangalore.
Dos, Windows’95, Ms-office (Excel, Power Point & Access)
HOD - Production
April 2014 to May 2015
Company Profile: Manufacturer of Water Storage Tanks and ROTO Molded products for Industrial, Road safety, Kids play, Environmental, construction, Aqua culture, furniture etc.
Job Profile:
Overall Responsible for Production, Quality, Maintenance, Cost Control as well as Development.
Preparation of Departmental Work-Instruction and QMS-Procedure as required by ISO.
Standardization of Chemical Formulation to Meet Quality & Testing as per Customer requirement in Conduit Pipe (20mm, 25mm & 32mm), Pressure (110mm to 250mm) and Waste Pipes(110mm to 125mm).
Production planning weekly / Monthly based on the buck order received from market department.
Standardization of reporting system in all Section from Production to Dispatch as required by Management.
Preparation of OEE, MIS-Report, Analysis of Defectives and their Root-Cause to implement to reduce Global Rejection fixed by the Management. (Pipe Rejection -6.5% and Tanks – 2%).
Break-down Analysis machine-wise and Overall Machine Efficiency to operate up to Minimum 85%.
Installation Auto Socketing machine of China Make as well as 4-Line & 2-Line China Extruder for Conduit Pipes.
Asst Manager Production
Sep 2011 to Apr 2014
Company Profile: Supplier, manufacturer and exporter of uPVC column pipes for submersible pump, cPVC pipes, cPVC fittings, uPVC solvent weld plumbing systems etc.
Job Profile:
Maintaining of Tool-Room (Die & Mandrel) with Proper Records of their movements from Issue to Receipt from Tool-Room to Production as well as their maintenance.
Weekly & Monthly Production planning, OEE/MIS as well as Monthly Defective Analysis with Root-Cause/ Trouble shooting of Various Defectives in Pipe & Auto Socketing Machine.
Validation of Process Parameters and set-up new process parameters Vs Chemicals Formulation and co-ordination with Quality department after final approval from Director Technical.
Production with Scanner to measure the Thickness on-line as well as Implementation of Ultrasonic Thickness Gauge to avoid the destruction of Pipes.
Monitoring Process Parameters, Maintenance Check-List, Sock-Yard.
Validation of Departmental Work Instruction time to time and System Procedures.
Production Executive
May 2000 to Sep 2011
Company Name: Sintex Industries Limited
Job profile:
Handling 325 Workmen and 9-Shift Engineer with 600 Mt. Production Capacities.
Was Management Representative for Implementation & Documentation of ISO-9001:2000
Handling Total Unit of Production / Maintenance & Quality as well as Preparing Annual Budget & Costing as required by Management.
Preparation of production & Improvement performance presentation for Annual Meeting.
Process & Mould Development with various Material & Chemicals time to time.
Cost Reduction through Goal Objective fixing in all department.
Manager Production
1997 to 1999
Company Name: Simba Plastics Co. Ltd.
Job profile:
Looking Production/Quality/Maintenance/Man-Power- Planning/Costing/Overall Operation/New Mould Design & Development Associated with Design Dept.
Implementing Preventive Maintenance Schedule on Machines/Mould and validation of Process Parameters, Quality Inspection & Testing Procedure in Rotomoulding, Pipe & Blow time to time with Effective scrap & Waste.
Achievements:
Production made with Aluminium Moulds (Make KELCH, England) i.e. Picnic-Bench & Table, Office- Chair, Garden-Chair, Pallet, and Cooler-Box & Tilt-Trolley.
Production & Assembly of 9 – Parts of Cola-Spot, Kiosk, of 5m x 2.5m (Designed by Excalibur, America) and made Instruction Manual for Assembling and Installation of Kiosk.
ISO-9001:2000 Training Operational Manual & Testing Procedure for all Products and Providing Technical Support to Sub-Ordinates
Under gone management Training on Leadership, Assertiveness & Improving Effective communication by HRD in Tanzania
Asst Manager Production
1989 to 1997
Company Name: Uniplas India Limited
Job Profile:
Looking Production/Quality/Maintenance/Man-Power- Planning/Costing/Overall Operation/New Mould Design & Development Associated with Design Department.
Implementing Preventive Maintenance Schedule on Machines/Mould and Process Parameters with Effective scrap & Waste.
Worked with various new moulds like Dustbins, icebox wheelbarrow etc, and having experience to Produce bigger 10,000 Lts. & 20,000 Lts in Rock-n-Roll Machine in Double Layer as well as Triple Layer Tanks.
Pipe Extrusion Machine:
Windsor Machine/Kabra Extrusion Technique [Single & Double Die-Head]/Thyson [Double Die-Head]/Rollepal Machine for SWR-Pipes, Die face Cutter Pelltizer, 4-Line Die-Head Twin Screw Extruder, China Machine for Conduit Pipes. Hot Mixer of Kabra, Neoplast.
Previous Experience With Rotomoulding Machines:
Rock-n-Roll Machines operating by LPG with multicavity & double Carriage Mould, Make SINTEX Industries Ltd.,
Free Stand Machine / High Productivity R-N-R, Make Sintex Industries Ltd and Extruder with LPG Operation for Colouring the Polymer and Single / Double & Triple Mill Powdering Machine make Sintex Industries Ltd.,
Rock-n-Roll Machine, Make M-Plast, Fixtron and Biaxial Machine (Both Fixed & Independent Arm) and REINHARDT, Baroda, 3-Arm & 4-Arm Roto Machine with 5-Station Computerized
Shuttle Machine, Triple Double & Single Mill Pulverised Machine and Die- Face cutter Palletising
Special Achievements:
Visual-Strip in Water Storage Tanks Incorporated to read the water Level.
Hinges In-Built on the top of the Tank to prevent the frequency wear & tear.
Trim – Waste reduction done in manholes area.
White Powder for Inner Layer for Double & Triple Layer Tanks.
LPG Burner Modification done to minimize the LPG Consumption.
Maximum Production 22 MT per Day & 600 MT per Months, Man Day 150 - 160 Kgs.
Implementation of in process & Final Inspection as per ISO-System Procedure.
Scrap Consumption with addition ration of 50%, 60% even 80% along with Virgin Material in Tank & Pipe
Experience With Moulds:
5000 Lts Silo, Milk-Tray, Piston cover, Box-File, Double-wall Pallet- Bin, Coca-Cola Kiosk. Double-Wall bed end, Coca-Cola Umbrella has developed in SIMBA Plastic Co. Ltd. 6000 Lts under ground / PT (Processing Trolley) / DBS / Wheel Barrow / Aluminium Mould / Mould Spider Manufacturing. / Septic Tanks. / Reva Car Bumped and Wheel, Mud-guard. Sump Tank (6000 Lts, 3000 Lts, 2000 Lts & 1000 Lts.)
Material Experience:
Having Experience with all Rotomoulded Grade LLDPE & HDPE i.e Borealines, Kiran
Impex, Sabic, Polyfin (Hexane Bas Ethlene) and IPCL / Gail / Helene
PVC Material, Make Chemplast / Reliance, LG-Japan and Various Chemicals & Additives.
Special Knowledge:
Preparation, Validation & effective Implementation of Departmental Work Instruction as Required for ISO 9001:2000 documentation Procedure / Attended Lead Auditor Training Programme by CII, Bangalore. / Up dated Process Parameter with New Material Formulation & Moulds. Periodically Conducting Training to Engineers, Supervisors, Operators on Process, Safety, Mock-Drill, KAIZAN, 5-S as per Standard Operation System.
Growth