Ref. No. : CA - 31718 - (Designers - Dies & Tools – with 9.7 years in Plastic Industry)

Education

Diploma in Mechanical

Skill Sets

Software Used: -
Auto-cad, Solidworks, Catia V5 R20, Ug- Nx,
Worknc (Vmc Cam Programming Software),
Autodesk Mould Flow Analysis

Work Experience

Design Engineering
6 months (still working)
Company profile- leading Manufacturer, Supplier of Power Control Panels

Job profile-
1) Design of Die Moulds for various types of plastic components using software’s Solidwork, Catia and
UG-NX., Special course in plastic part design
2) To create revers warp CAD model generation as per mold flow report
3) To create Feasibility report as per customer requirement.
4) Plastic part design in catia V5RS20 wire plastic harness design, NX 11
5) Tool cost supply to NPD head
6) Concept Design, Core & Cavity Extraction, Mould design.
7) Planning of Mould Manufacturing, VMC Planning, EDM planning
8) Preparation of Tool Development Reports & TimeLine
9) Handling all ECN & Modifications, Dimension Corrections
10) Electrode Design & Movement Drawings Preparation.
11) Conducting tool trial knowledge of molding process
12) Carried Out Trials & after Trial Correction Works
13) Interaction with Project, Design, Cam & Machining Departments
14) Also Monitored Modification works in Moulds
15)Mold assembly & Trial knowledge

Design engineering
Work Duration: - 3.5 year
Company profile- Manufacturer & Supplier of Automotive And Consumer Goods Plastic Parts, Bio Mass Stove.

Job profile-
Design of Die Moulds for various types of plastic components using software’s Solidwork, Catia and
UG-NX., Special course in plastic part design
2) To create revers warp CAD model generation as per mold flow report
3) To create Feasibility report as per customer requirement.
4) Plastic part design in catia V5RS20 wire plastic harness design, NX 11
5) Tool cost supply to NPD head
6) Concept Design, Core & Cavity Extraction, Mould design.
7) Planning of Mould Manufacturing, VMC Planning, EDM planning
8) Preparation of Tool Development Reports & TimeLine
9) Handling all ECN & Modifications, Dimension Corrections
10) Electrode Design & Movement Drawings Preparation.
11) Conducting tool trial knowledge of molding process
12) Carried Out Trials & after Trial Correction Works
13) Interaction with Project, Design, Cam & Machining Departments
14) Also Monitored Modification works in Moulds
15) Mold assembly & Trial knowledge

SRUSHTI TUBES PVT. LTD. (Assembly’s Department)
Work Duration: - 6 months
Roll & Responsibilities:
1) Planning & scheduling of production as per requirement.
2) Instruction and train for workers.
3) Analyze operations to set standard working time and identify capacity improvements

BHARAT FORGE (Quality Department)
Work Duration: - 18 months
Roll & Responsibilities:
1) Quality Auditor in MD1 Line its Manufacturing Daimler Perkins Crank Shaft.
2) Maintain 5S on line.
3) Maintain process parameters regularly
4) Making Standard Report in Tasting Lab
6) Planning & scheduling of production as per requirement
7)Arrange trainings of new as well as present operators to improve their efficiency.
8)Achieving Daily and monthly production schedule with Zero defect at customer line.
9) Improving Productivity and quality through continuous improvement process and process
characteristics and reduce product cost.

Work Duration: - 6 months
Roll & Responsibilities:
1) Programming of VMC & CNC machines.
2) Having experience on batch and mass production
3) Participation in WHY- WHY Analysis for action plan.
4) Achieving Daily and monthly production schedule with Zero defect at customer line.
5) Improving Productivity and quality through continuous improvement process and process
characteristics and reduce product cost. Implementation of Kaizen, 5S in organization.

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com