Ref. No. : CA - 17473 - (Production - Moulding – with 13 years in Plastic Industry)

Education

Post Graduate Diploma From Plastics Processing & Testing [P.G.D-P.P.T] in 2009 to 2011 C.I.P.E.T, Aurangabad [MH] With 78% marks

B.Sc. [Chemistry] From N.M.U University, Jalgaon in the Year 2009

12th From Nashik Board, M.H in the year 2004

10th From Nashik Board, M.H in the year 2002

M.B.A (Operation) (in distance learning) Appear 

Skill Sets

Trouble shooting, Trials of new moulds & materials, SAP handling

Systematic and self-motivated.
High confidence level
Superior time management skills
Ability to learn and adapt to new technologies quickly and efficiently
Can work in team

Work Experience

Production Engineer 
Since Oct 2012 To Till Date
Company Profile: A Global Provider By Manufacturing Of Automotive Parts. Full Service Supplier In Plastic Moulded Modules, Machined Forgings & Auto Electrical Commodities. Manufactured Components Are Pulsar Parts, Radiator Tanks, Oil Tank For Both 4 Wheeler And 2 Wheeler, Tata And Mahindra’s All Assly Parts Etc.
Job Profile:
Handling All Thermoplastic Injection Moulding Machines Up To 30% Gf With Different Grade, Maintain Of Production Documents.trouble Shooting In Injection Moulding Process Mould Correction & Modification, Well In Engineering Plastic Processing
Cost Reduction Activity  By Technical Improvement In Man, material, method, machine, Tool (4 M T Condition) Power And Planning Utilization
Contribution For “Mis” About Injection Moulding Process Work In Cft (Cross Functional Team) To Improve Quality And Reduce Rejection Cost Daily Attaining Qsr Meeting To Solving Customer Complaints
Trial Of Different Materials And Moulds. Keen Eye In Self-certification Of Component. Maintaining 5s In The Department, Injection Moulding Process Optimization. Evaluate Oee&ope, Lead Kaizen Activity
Poka Yoke Smed Minimize The Percentage Of Rejection.
Training To Operator, And Trainee People Sap Handling Ts 16949 Documentation

Machine Handled:
Super Master 250t- 850t, Mitsubishi 650t-850t, L & T(demag) 450t-550t, Feromatic Milacron 450t-660t

Material Handled:-
Nylon 6, Nylon 66, Pp, Abs

Achievements:
Increased Productivity by Cycle Time Reduction
Reduce Lumps Generation During Colour Change& By Planning Same Material Moulds On The Machine
Initiated Kaizen Improvement At Shop-floor
Maintaining Work Place As Per 5s Slandered 
Mould Change Time Reduced By 50 Min To 30 Min Safety Improved In Ultrasonic Welding Operation By Implimenatining Poka Yoke Developed Standard Trollies For Sfg Storage

Production Engineer 
Aug 2010 To Oct 2012
Company Profile: Leading manufacturer of electrical switches
Job Profile: 
Handled Whole Process Of Both Thermoplastic And Thermoset Injection Moulding Machine(arburg 30t,0 L & T 35t, And Mir 200t, Krauss Maffei 250t) With Material (Pa-6, Pa-66, Pc, Pbt, Pps, &Dmc).

Training attended-
Fire  fighting
TPM Training
KIZEN
5S

Future Goals

To get a challenging position in a dynamic and result oriented organization where my
Educational and technical skills may enhance & work in a competitive and continuous growing environment with positive attitude.

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com