Ref. No. : CA - 18458 - (Production - Moulding – with 13.2 years in Plastic Industry)

Education

B. E (MECH) From PET Engg., college Vallioor, Anna University in 2012 With 73% First Class

H. S. C From Concordia Hr. Sec. School, Vadakangulam, State Board in 2008 With 81%

S.S.L.C From Concordia Hr. Sec. School, Vadakangulam, State Board in 2006 With 88% 

Skill Sets

STRENGTH
High Tonnage machine process setting and mold setup
Good knowledge in water treatments
Handling properly high precision mold/ Hot runner molds with multi core operation
Worked with wide variety of materials
Handling of PLC controlled injection molding machine from 50 tons to 900 tons
Having leadership Qualifier capable of motivating my team and leading them from the front in achieving the target
Knowledge of tools of data analysis like QC tools
Set up the de humidifier dryers ,heaters and production equipment’s
Plant startup and shunt down procedure
Effective handling of Machine and molds troubles shooting repairs

Software’s known
MS OFFICE, SOLID EDGE, FEMAP, BASICS OF ANSYS.

Work Experience

Shift Engineer
Since May 2015
Company Profile: Manufacturer of Injection & Blow molding of PET Preforms and bottles

Shift Engineer
Oct 2013 To May 2015
Company Profile:  Manufacturer of precision engineering plastic components, plastic Bucket, plastic tub, pet preforms (from 300 ml up to 5000 ml), & Pet caps
Customers : Whirlpool, Godrej, Jyothy lab, Kiwi care, PET India

Shift In Charge
Jun 2012 To Sep 2013
Company Name: Abirami PET Industries,
Company Profile: Injection molding & Blow Molding of 20 Littre, 10 Littre, 5 Littre, 300 Ml, 500 Ml,
1000 Ml, 2000 Ml Pet preforms, CSD, HOT FILL Preforms, Pet caps, Pet jars
Job Profile:
Production planning, Raw material planning and control
Effective handling of Dehumidifiers and Chillers
Reviewing with unit head the production status daily / weekly / monthly basis
Handling customer complaints with proper analysis and worker
Reducing in process rejection by doing proper analysis
Process standardization, Trouble shooting in new mold trails
Implementation of all the process parameters required for maintaining quality of the products
Maintaining all record
Maintain 3C &5S on shop floor

Major Achievements
Reduced the percentage of scrap in production operation
AS a member of mold change time reduction  team we achieved the target
Reduced rejection and runner wastages
Optimizing the manpower 
Achieved the raw material usages ex: RP & RG to maximum level
Implementation &modify the pet injection molds

Materials Handled:
PET, ABS, PPCP, PPHP, HDPE,LDPE,HIPS,HDP,LDP, LLDP, SAN, TAG FILL, PMMA, NYLON, POM
Machine Handled:FEROMATIC MILICRON, JOHNWAI (Two stage Injection) WINDSOR, TOSHIBA and L & T, LG, JSW, ARBURG, DEMAG, CINCINNATI MILACRON, SUMITOMO.
Molds

Handling  of  all types  of mould with multi core operation, hot runner and multi cavities
Repair & maintenance of of all types of mould like air injection molds, valve gate system moulds, HR Pin system moulds 

Future Goals

To pursue a highly challenging carrier, where I can apply my knowledge and acquire new skills and contribute constructively to the organization.

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com