MBA Operation Management From Vapi Silvassa Center SMU-DE in 2015
PGD-PPT From Aurangabad (MH) CIPET, Chennai
IST in 2010
B.Sc (Bio) From Faizabad in 2007 with 50.83%
12th From UP Board in 2004 with 66%
10th From UP Board in 2001 with 44.83%
Able to work under Pressure and with little Supervision.
Have Problem Detecting and Solving Skills.
Self-motivated and active team member
Work on Window, MS Office, MS Word, outlook, Power Point and Internet Explorer, Work on ERP System and Navision, Ctrix.
Hard working. & Positive thinking
Basic Computer Training Aurangabad(MH) From Cipet Chennai in 2009
Shift Engineer
Since Sep 2011
Company Profile: Leading Manufacturer of Agri fitting, Roof Water, Plumbing fittings SWR item.
Job Profile:
Work Experience on Injection molding Machine-Haxing (58 T to 368 T),
Donghusha (160 T) & Windsor (130 T to 350 T.)
NS(100 T to 500 T, Windsor 128 T, A T 240 T, ESM 200 & 280 T ESM 200 T & 280 T, LG (160 T, 450 T), CJ 250 T, JSW 500 T, AT 150 T to 250 T
Responsible for production and process activities viz planning as per load condition
Target achievement and to increase productivity.
Trouble shooting of mould related problems and development.
Process monitoring as per data sheet.
To train man power to achieve standard production.
To minimize d/t & increase production efficiency.
Reduce wastage%
Manpower Handling.
Material Management.
Continuous monitoring & reduction of CT semi auto to Auto running of mold for IMM.
Regular interaction with shift engineer and supervisor for daily production
Daily interaction with concern Dept superior and Head.
Monthly Capacity planning as per Stock
Attend meeting and make POA for discussion related task.
Attend daily meeting with supervisor.
Generation & implementation of cost reduction Kaizens.
Ensure min. Max stock level shop for all component
Ensure use of personal protective equipment PPE by operator, causal molds changers
Implement safety related awareness training to mold team.
Ensure safe operation including safety of MC mold, component and manpower
Implementation of TPM, SMED
Maintain 5’S in Dept.
Shift Engineer
Feb 2010 to Aug 2011
Company Profile: Leading the manufacturer of Nylon cable tie and accessories.
Job Profile:
Daily update production log book and prepare mold change Schedule.
Setup the process Parameter during new mold startup
Fault finding troubleshooting
To make material requisition slip and receive material from store
Material Mixing and handling
Minor machine maintenance
Rectification of the mold with tool room.
To lookup grinding and mixing.
Manpower handling and Arrangement as per required
Lookup the chiller unit.
Trainee Engineer
Aug 2009 to Feb 2010
Company Name: Videocon Industries Pvt. Ltd.
Company Profile: Leading manufacturer of TV Front and back Cover.
Job Profile:
5S Training
Knowledge on Injection Molding Machine–JSW-850 T, LG -650 T, CLF-1380 T.
Project Task Work:
Wastage Reduction, to reduce the process down time and increase production efficiency. Work on SMED for reduce mold change time, mold change time reduction, to reduce process deviation make POA of the task as per required.
To pursue a challenging carrier in an organization providing stimulating work environment & opportunities for performance oriented carrier growth.
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com