Ref. No. : CA - 6002 - (Maintenance and Service - Electrical – with 25.4 years in Plastic Industry)

Education

Diploma Electronics University : Board of Technical Education Mumbai
College : S.S.T.C , COET, Jalgaon Year of passing : May 1999 Final year Percentage : 62.19

Computer Knowledge
O/S : Windows 98/2000.
Software : MS office,

Skill Sets

Having good knowledge of plastic processing machines of different make & different control.

Work Experience

Junior officer
1st June 2005 to till date
Presently working with leading manufacture : Plastic Heavy Luggages
Job Profile
As a Junior officer in maintenance department working on plastic processing machines injection moulding m/c (Engel make), vaccume forming machines, excluders.
Attending Electrical & mechanical maintenance break down of machines .
Keep the utility m/c maint compressor, D.G, water chillers, cranes, stackers, and forklift.
Electronic card repairing.
To carry P.M of machines.
Object to control the down time of machines by preventing less elect, mech maint , utility breakdown.

Trainee Engineer
1st Sept 1999 to 20th May 2005
Worked with Jain Irrigation systems Ltd. Jalgaon, Manufacture - Irrigations product, Plastic sheet etc.
Job Profile
Join as Trainee Engineer in Injection moulding division in electrical Maintenance dept. Worked on Plastic processing machines with different make & different control ckt. Such as Cincinnati Milacron, LTM - DEMAG, Klockner Windsor with control CNC, PLC, MMC, Micro processor, gate logic, relay logic control. Also worked on excluders & on tool room machines EDM, Lathe, Milling etc.
Attending Electrical maint. Break down.
Electrical maint. Of utilities machine compressor, D.G etc.
Electronic card repairing & Temp. Controller Calibration.
To carry out P.M of machines.
Internal auditor for Q.M.S.
Main objective to control the Downtime of machines.
Within the given target & the Maintaining the machine
within the given budget.
Proper Stock maintaining of machines spares.
Carring document work of Q.M.S.
Project :- 1) Energy saving project on Injection moulding Machine of
windsor make by connecting VF modules drives by which
we have get 60 % energy saving.

Future Goals

*KKS
would like to have more challenging environment & hold desire for change creativity & innovation to gain & widen working knowledge, add value to my responsibility.

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com