Ref. No. : CA - 4767 - (Production - Machinery – with 19.3 years in Plastic Industry)

Education

Diploma in (Mechanical) Automobile Engg. with first class (62%) from MSBTE Mumbai board in the year 2002.
SSC passed with first class (72%) from Irwin Christian Enlgish Medium High School
Under Pune board in the year 1999.

Skill Sets

Cad design: catia V5 (modelling and surfacing software) from college of Engineering pune.
Operating system: window 98, window 2000, window xp, ms office, Auto cad 2004, auto cad 2007.

Work Experience

Junior Engineer - project engineering devolpment department
Jan 2006 to till date
Various project (internal and external project) has been undertaken.
Providing inputs and devolping master specification with need assessment.
To verify customer complaint of spm machine.
Commissioning of new product to the customer
Successfully managing (resourcefully operation) maintaince/ quality control for plant material Machinery and utilities.
Expertise in undertaking technical guidance to the client.
Expertise in managing the operation/ testing activities.
An effective communication with excellent team leadership skills and strong analytical
problem solving and organizational skills.
Excellent relationship management skilled coupled with effective communication skills.
Area of exposure:
Proactive identify areas of checking testing/ operations and take to rectify the equipment executing
Cost saving and energy saving techniques/ measures and modification to achieve substantial reduction in o&m expenditures and work within budget.
Providing technical inputs and devolping master specification with need assessment.
Carrying out inspection test for determining the effectivenessof equipment/ plants.
Implementing latest tools to ensure quality management.

Production Engineer
December 2004 to Dec 2005
Worked with Varroc Engg Pvt. Ltd.
This is a plastic components manufacturing unit. Vendor of Bajaj Auto Ltd., Tata Auto Ltd., L & T Ltd. etc.
Responsible for successful installation and commissioning Activities of machine for
new product.
Man power planning, trouble shooting related to problem on line and customer complaints.
Training to new cell members for working on production line.
Successfully achieving the target.
Project profile:
Welding Stack Machine: Cost around 1.2 crore.
Duration: 6 Month.
Description: welding stack machine consist of following major parts.
1) body 2) cylinder 3) power source 4) power pack 5) plc programming 6) jig and fixture.

Welding stack machine is generally used for welding of Stator body required for diesel generator so to increase the Production in less time and less manpower with very good
Accuracy. The objective of this project is to enhance the Existing system to eliminate its several limitation.

Welding Booth: Cost around 20 lakh.
Duration: 4 Month.
Discription: welding booth consist of following parts
1) fabricated door 2) filming glass 3) welding equipment 4) welding gun.
Welding booth project is essential in every organization
To avoid eye contact of welding spark which is very Harmful. Our aim is to design a welding system which This shortcomings and add new features.

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com