Ref. No. : CA - 4069 - (Quality – with 20.1 years in Plastic Industry)

Education

3- Year Diploma in Electrical Engineering from Govt Polytechnic, Sundernagar with 63.2%

Work Experience

Q/C Engineer
Since April 2006 to till date
Presently working with a leading Manufacturer of Domestic Appliances such as Washing Machine, Wet Grinder, Food Processor, Juicer Mixer, Grinder, Hand Blender, Electric Iron, Oven Toaster Grill, Sandwich Toaster, Water Heater.
In House Production of all above motors
In House Production of Plastic Components of above mention Appliances
on important Moulding M/Cs
In House Production of motor parts such as shafts stamping cover etc.

Q.C Engineer (Incoming Quality Control)
Since January 2005 to March 2006.
Worked With M/s. Ellin Appliances Pvt. Ltd., Nalagarh, (H.P.)
COMPANY PROFILE:-
AN I.S.O- CERTIFIED COMPANY Comaker of Philips India Ltd leading manufacturer of home appliances - Mixer Grinder, Bar Blender, Toaster & Ear Phone etc.
JOB PROFILE:-
To ensure Incoming Material inspection as per the sampling plan (plastics materials made of P.P, G.P.P.S, A.B.S, P.C, L.D/H.D, NAYLON G/F ETC, spare parts of MOTOR, B.O.C items for assembly of Food mixers, Iron, Juicer mixer & grinder, Food Processor, Wet grinder etc.
To ensure, QDS for every new drawing & issuing of inspection report on QDS/Quality Report Format. Direct dealing with the vendor along with purchase for quality related issues. Preparation of Vendor rating for the key vendors along with purchase deptt. To prepare survey sheet of the incoming materials with status & action plan for improvement.
To ensure Quality of inspected materials, What % of items not giving problem on production line.
Ensuring good quality from vendors (Vendor rating) & Lot acceptance to improve
To ensure P.Q.C for every staple product & maintain every week & report FOR (with help of exploded view)
To prepare Corrective Actions for F.O. R. Prioritise, prepare fish-bone diagram for difficult problems, prepare PDCA.
Out going report (P.D.I) for every appliance and lot acceptance % & To prepare Corrective Actions for problems & faults .
To take part to perform Application Test appliances every month.
To take part in Routine Reliability Prepare reliability plan for every month and test accordingly.
To take part in Bench Marking exercise
Field Call Rate- Nos of problems solved together with R&D by testing & certifying
Take part in Testing for product release as per R & D Guidelines .

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com