Job Profile:
Installation & Commissioning of LPG Treating Unit.
Checking the Unit as per P&IDs & monitoring of progress status, also report preparation w.r.t mechanical completion.
Check listing of all the equipments (e.g. Pumps, Columns, Filters, Vessels, Heat Exchangers, etc) before commissioning.
Pre-commissioning trial runs of the equipments.
Crosschecking of the field-readings of Instrument-Tags with the DCS Panel & pointing out the miss-matches for rectification.
Flushing the equipments & piping with water & steam before start-up & commissioning.
Collecting the plant operating data on daily-basis during start-up period.
Preparation of performance monitoring reports.
Collecting the LPG & Caustic samples (as & when required) & recording the laboratory analysis report.
Necessary co-ordination during Performance Guarantee Test-Run period.
Checking the Unit as per P&ID, also identification & marking the hook-up points (as per P&ID) in the field for the revamp of Atmospheric & Vacuum Distillation Unit-1/2.
Checking of the modifications done as per project scheme.
Collection of site-data for preparation of improvement schemes during project implementation stage.
Co-ordination/follow-up with different implementing departments for implementation of process-schemes.
Collecting the plant operating data on daily-basis after revamp of AVUs for preparation of performance monitoring reports.
Collecting the different product samples (as & when required) & recording the laboratory analysis report along with performance monitoring reports.
Necessary co-ordination during Shut-down & Performance Guarantee Test-Run period.
Preparation of As-Built P&IDs
Collection of data (e.g. line size, line destination, etc) from the site.
Preparation of sketches in EXCEL sheets to develop as-built P&ID.
Verification of the drawings w.r.t site data & actual plant.
Finalization of P&IDs for making in AUTOCAD.
Preparation of existing Flare & Fire-Water network on Overall Plot Plan of Refinery to indicate exact routing & design new flare network.
Collecting the data required for detailed Engineering & the design of MSQ Project.
Collection of site-data & preparation of sketches for making different improvement schemes related to MSQ project.
Technical Assistant (Industrial Production Section)
Nov 2005 to Apr 2007
Worked with Exide Industries Limited.
Job Profile:
Technical supervision in the production area of Lead-Acid Battery.
Checking the quality of positive & negative plates at each stage of Casting, Pasting & Oxide-Filling.
Forming the plates by preparing the schedule of charging & discharging duration of the plates.
Testing the performance of the battery by charging & discharging, also calculating the acid-volume & percentage capacity.
Collecting the different samples (as & when required) & recording the laboratory analysis report.
Necessary co-ordination / follow-up with other executing departments for any clarifications or feedback.
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com