Ref. No. : CA - 12026 - (Maintenance and Service - Electrical – with 36.5 years in Plastic Industry)

Education

MBA from IASE Deemed University near the town of Sardarshar in India’s
North-western state of Rajasthan, India.
B.Tech in Electrical Engineering from IASE Deemed University near the town of Sardarshar in India’s north-western state of Rajasthan, India.
Diploma in Electrical engineering from Dayal Bagh University Agra, India.
HSC (Science) from Board of Uttar Pradesh, India.

Skill Sets

An Electrical Engineer adapt at usage of computer application with 25 Years of experience in the area of Project planning, Erection & Commissioning and through experience in the Field of Preventive, Predictive & Breakdown maintenance of plastic injection molding plant. Production planning, quality system inspection & monitoring of the following plastic/ Electrical /
Instrumentation control system concerned with the below mentioned.

Work Experience

Manager Service
Since Aug 2012
Company Profile:
The leading injection molding machine manufacturers, importing & exporting traders as well as various professional research institutes.
Responsibilities:
Erection, commissioning and maintenance, training and trouble shooting of plc controlled plastic injection molding m/cs ( 60 t to 2400 t).

Manager Service
April 2012 to Aug 2012
Company Profile: anufacturer of plastics machinery, injection molding machines etc.
Responsibilities:
Erection, commissioning, operation and maintenance of plc controlled and servo system pump (VFD) plastic injection molding m/cs (60 t to 2400 t).
Installed and commissioned m/cs for customers: Krishna Maruti ( 2400 t), Nobel Noida & Haridwar ( 1800 t), Vimal Gr. Noida & Manesar ( 1400t), DLJM Noida and Gr. Noida, Kustocom Noida, Supreme Khuskhera & Pune.

Manager Sales and Service (supporting sales from out side)
Nov. 2003 - May 2010
FCS ( Fu Chun Shin) Machinery Manufacture Co. Ltd.
Responsibilities: Erection, commissioning and maintenance of plc controlled plastic injection molding m/cs ( 60 t to 2400 t)

Manager maintenance
Feb. 2003 to Sep. 2003
Motherson Automotive Technologies and engineering ( MATE), Noida
Responsibilities:
Plant Maintenance including injection and blow molding m/cs. electrics & automation consisting of ABB/ Simence PLC controlled variable AC/DC drives, Erection, Commissioning and maintenance of HT & LT substation equipments, Compressors, A.C. /D.C. Drives, EOT cranes, D. G. Sets etc.

Manager Operation
Sept 1998 to June 2002
Toshi Auto Industries Ltd. Faridabad & Manesar
Responsibilities:
Plant Maintenance including injection and blow molding m/cs. electrics & automation consisting of ABB/ Simence PLC controlled variable AC/DC drives, Erection, Commissioning, Operation and maintenance Of HT & LT substation equipments, Compressors, A.C. /D.C. Drives, EOT cranes, D. G. Sets etc.

Self Employment
Sep 1990 to Aug 1998
Responsibilities:Erection, commissioning, operation and maintenance of and plc controlled injection molding machines and other PLC based m/cs

Service Engineer
Feb. 1987 - Oct. 1990
Klockner Windsor India Limited, New Delhi
Responsibilities: Erection, Commissioning, operation and maintenance of plastic Injection molding machines.

Job Profile:
To set up and complete the plastic injection molding plant project( selection of m/cs, plant layout, construction of building, laying, erection, commissioning of m/cs and equipments, costing of products, run the plant and hand over to production deptt)
Departmental manpower management & monitoring their responsibilities, also to encourage & guide the employees to perform as a team.
Co-ordination with the maintenance & Production departments.
Existing system’s Preventive, Predictive & breakdown maintenance to reduce the system down time.
Spare parts inventory management.
Safety aspects of the existing system as well as for man power too.
To lead the energy management cell for the optimization of the energy consumption.
Preparation of Budget, Work schedule, Estimates, work order & ISO documentation etc.
Planning, indenting and procurement of spares
Production planning ( machine loading days, raw material, man power etc)

Future Goals

To serve diligently & sincerely as a Key Engineering person ensuring sovereignty, reliability & stability of the system.