Pursuing M.B.A through distance education in MKU.
Bachelor of Mechanical Engineering, with an aggregate of 73.4% from Institute of Road and Transport Technology, Erode, affiliated to Bharathiar University, 2002.
Sri Ramakrishna Mission Higher Secondary School, Chennai (Tamil Nadu State Board), Aggregate of 76.5.
S.S.L.C.
Sri Chakravarthy International Matriculation Academy( Matric), aggregate of 75.45.
ANSYS and IDEAS ( was trained at AU-FRG Annauniversity)
Exposed to ERP(oracle11 i) Inventory, Purchase 0rder, Order Management
Autocad 2000, Ms- office, C,C++
Team Member - Vendor development
from Dec 2007.
With leading company manufacturing completely built Luxury bus.
This is a green field project so had a additional activities like co-ordinating in project, Schedule preparation, project status presentation etc.
RESPONSIBILITIES
Responsible for vendor development & procurement.
Identifying vendors for similar product.
Initial discussions with suppliers
Schedule for development
RFQ & Receipt of quote.
Finalizing and Order releasing
Coordinating with supplier and developing component as per specification and schedule.
APQP tool used while developing new component.
Budget preparation.
ENGINEER from March 2004 to February 2006
and
SENIOR ENGINEER (Materials) from March 2006 to Dec 2007
with SIMPSON & Co. Ltd., Chennai manufacturers of Diesel Engines.
JOB RESPONSIBILITIES IN MATERIALS
Planning and Procurement of O.E. items to Manufacture Engines.
Releasing schedules based on production plan.
Monitoring and ensuring the supplies based on schedules.
Developing new vendors for existing components for price reduction and for critical components.
Developing new components at existing vendors.
Continuous Monitoring on Inventory, necessary step for reduction.
Purchase order preparation, Material resource planning using Oracle-11i-E.R.P. Package.
Coordinating with supplier if any quality related problems.
Physical quantity stock checking.
ACHIEVEMENTS
Changed the material of flexible pipe from Nylon 12 to metal pipe.
Commonised use of certain studs, which is easy to handle.
Reduced the usage of Carton boxes and plastic covers by introducing recycle bins at the suppliers end.
Fabricated test-beds with two flywheel for easy setting change of engines Implemented production cycle time reduced.
Fabrication of pallets in conveyor for loading all types of engines.
Implemented FIFO (First in First Out) system for all types of engines, thereby delivering the engine in time to customers.
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com