Ref. No. : CA - 15961 - (Maintenance and Service - Electrical – with 16.5 years in Plastic Industry)

Education

B.E. (Electrical & Electronics Engg.) From AFSET College Faridabad (Haryana) under 

M.D.U. Rohtak (Haryana) in 2008 

Skill Sets

Experience in different type electrical & instrumentation maintenance like control Panel, Starter, Motor ,Breaker ,Hoist, different types of PID Temperature controller, control valves , pressure transmitter, transducer, VFD drives like-Yaskawa, VFD delta, Denfosis, LG, Mitshibuishi, Frenic Multi, Compressor-Atlas-Copco, Reciprocating compressor, IR Screw compressor, ChillerMake-Daikin, AHU System Heater controlling, Pressure controlling system.

Operating System – Windows XP
Documentation- MS Office XP (Excel, World, Power Point)

Work Experience

Electrical & Instrument maintenance Senior Engineer
Since Feb 2013 
Company Profile: Manufacturer of filament yarn
Job Profile:
Reporting to Technical GM day to day.
Check the daily report log book of technician.
Abnormality to be discussed with technician & GM.
Prepared Engineering weekly report, monthly report.
Supervision of daily activities of technicians as per jobs allotted.
Taken plant round and monitoring all of winders, control panels, inverter drive panel.
Daily P.M work of machines motors, panel checking to be done & provided to materials, tools as per requirement.
Responsibility of shift tools, catalogues, drawing maintain, shift log book.
Indented, requirement material discussed with manager & follow-up pending indent material to smooth running of plant.
Attending breakdowns in night shift and also when required by technicians.
RGP & NRGP material follow-up.

Project handled:
Project handled of TMT POY winder ATI-614/10R erection & commissioning work for a new line for POY plant 24 winders. All erection & commissioning work to be look like power cable laying , termination, cable tray laying, fabrication & modification work, all Power panels charging work, all instrumentation Control panels Commissioning work , control cables laying & termination work, all instruments like RTD, Pressure Transmitter, different types of PID controller ,thermocouple, pressure controls, heater temperature control system work to be done.
Another Project handled of Barmag FDY (Fully Drawn Synthetics Yarn) Make Germany Winder- ACW5T/1380-12 erection & commissioning works for 1 nos. old line 8 winders. All erection & commissioning work to be look like power cable laying , termination, cable tray laying, fabrication & modification work, all Power panels charging work, all instrumentation Control panels Commissioning work , control cables laying & termination work, all instruments like RTD, Pressure Transmitter, different types of PID controller ,thermocouple, pressure controls, heater temperature control system work to be done.

Electrical & Instrument Maintenance Engineer
Feb 2012 to Feb 2013
Company Profile: Manufacturer of polyester yarn 

Electrical & Instrument Maintenance 
July 2011 to Feb 2012
Company Name: Nova Petrochemicals limited 
Company Profile: 

Electrical & Instrument Maintenance 
Aug 2008 to 27 June 2012
Company Name: Pioneer Embroideries Limited 
Company Profile:

Trainings Attended:
Summer Training 
1 Months
Company Name: Reliance Infocomm Pvt. Limited 
Company Profile: 

Vocational Training
1 Months
Company Name: Electrolux Limited 
Company profile:

Future Goals

Seeking assignments in Electrical & Instrument / Operation with a growth oriented organisation in Instrument Sector

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com