Currently Pursuing Bachelor In Science Engineering & Technology from BITS Pilani.
Diploma in Mechanical Engineering with First class from Shri Baghubhai Mafatlal Polytechnic.
Autocad 2D.
Production Planning & Vendor Devlopment
Completed SAP Training from Siemens Ltd In Production Planning Module in ECC 6.0.
As a Production Engineer
Since June 2004.
Presently working with leading company
Determine production layout, line configuration, line balancing, line optimization and development of time standard methodologies.
Provide leadership in customer quality and efficiency efforts by directing support teams to improve cycle times and reduce defects.
Lead the team in technical assignments involving reducing manufacturability issues and maintaining timely product flow for assigned product (s).
Lead communication with all internal departments, suppliers and customers.
Responsible for manufacturing of jigs & fixtures required for production.
Responsible for providing corrective action in and out of control situation.
As a Production Engineer
From Aug. 2001 – Jan. 2004
Celetron Power Pvt. Ltd - subsidiary of Golden Systems Inc, based in USA & was involved in the manufacturing of Switch Mode Power Supplies.
My job involved achieving production targets of Magnetic transformers, with least of the rejection & co-ordination with Stores & Planning to have all the kits on time.
Responsible for inventory of raw material and finished goods
Responsible for evaluation of product by performing design verification test process maturity test and critical component evaluation before the product is transferred in to mass production.
Responsible for evaluation of new machines and tooling in terms functionality and the quality of output.
Responsible for verify fixtures for acceptability of regular intervals and maintain records.
Responsible for continuous process improvements for zero defects.
Plastic Mould Maker
From (Feb 1997 to AUG 2001)
Milton Plastics - manufacturer of Industrial moulds. I was responsible for assembling & maintenance of plastic moulds mainly for production of household items.
On-the job training of a bench fitter
Aug-1993 to Aug-1996)
Siemens Ltd
was involved in development of Jigs & Fixtures for various projects.
Under gone training on all conventional machines.
Objective To seek the responsible position in the organization & put in my sincere efforts for enhancing the profitability of the organization and overall growth of the self.
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com