Ref. No. : CA - 33701 - (Quality - Injection Moulding – with 9.7 years in Plastic Industry)

Education

Seshasayee institute of technology, TRICHY, TAMIL NADU
High School Diploma, Diploma Instrumentation and control engineering, Jun. 2014

Skill Sets

MS OFFICE
Qc tools
SAP

Quality management system Expert
Quality systems & standard Experienced
Computer knowledge

Work Experience

Sr.quality Engineer
From- Aug. 2018 Present
Company Profile- Manufacturer of UPVC Window, UPVC Door & Casement Window

Job Profile-
To check and approving all dimensions as per standard for FOA (first of approval) at uPVC profiles.
Supervised And managing Quality Control Team members.
Customer end rejection monitoring and root cause analysis and presenting the same to customer.
Ensure control plans and associated documentation are implemented effectively and maintained.
To check the uPVC profiles lab testing for Impact strength, tensile strength and elongation, heat aging ,reversion test, Dicloromethene etc.
Testing of uPVC Profiles as per standards. example EN 12608 and ASTM standards.
Also three months once all lab testing conducted on CIPET lab chennai.
To handle Photo spectrometer (X-rite) Color checker machine. To ensure L,A,B color value reading half-hour once.
To follow non conformity (NC ) report for Out of spec and rejection products.
Maintain the All instruments Calibration report.
Ensure compliance and assist with adherence to the Quality Management system (ISO 9001:2015).
Assist Quality manager in establishing, implementing and maintaining the quality management system
Analyzing Daily/weekly & monthly rejections using various problem-solving techniques.
To follow extrusion inspection report as per iso documentation.

QC Engineer
From- Sep. 2016 Jul. 2018
Company Profile- Upvc ,Cpvc ,Swr, HDPE pipes And fittings manufacturer

Job Profile-
Closely monitoring and examining each stage ofthe entire production process.
Document preparation as per Iso auditing.
Experienced with extrusion, injection molding, manufactures laboratory.
Segregating non-conforming parts in accordance with written quality procedures SOP.
Making sure that company employees follow documented procedures and standards.
To check and approving job for FOA(first of approval) both pipe and fittings.
Collecting defect samples and explain the problem for operators. Preparation of corrective & preventive action reports for customer quality issue.
Reports preparation as per ASTM standards.
Testing of UPVC pipes & fittings as per ASTM standards.
Testing of CPVC pipes as per BIS standards.
Testing of SWR pipes & fittings as per BIS standards

Quality control Inspector
From- May. 2015 Jun. 2016
Lakshmi machine works (LMW). Coimbatore, Tamilnadu

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com