M.B.A From Sikkim Manipal University in 2014
Post Graduate Diploma in plastics Processing and testing) From Central institute of plastic engineering & Technology. Jaipur (Rajsthan) CIPET in 2012 With 75%
B.Sc. From Devendra Post graduate college, Belthra road, Ballia. V .B.S. Purvanchal university, Jaunpur in 2010 With 50%
H.S.C From Dev raj I.C Pashuhari, Ballia UP Board in 2006 With 64%
S.S.C From Pabbar yadev H.S.S. Awarai khurd, Ballia UP Board in 2004 With 60.66%
Software : AutoCAD, MS Office, Basic computer, DFA
Operating system : Windows XP/ Vista, Windows 7/ 8
Shift Incharge - Moulding
Present
Company Profile: is a High quality mould making facility, fully integrated with Design, Development & Manufacturing of Injection & Blow Moulds and Manufacturing of Moulded Components for Automotive, Appliances & other Industries
Assistant Engineer
Company Profile: Specialises in large size injection moulding, blow moulding, compression moulding and vacuum forming, which are supported by post moulding operations. MATE manufactures a wide range of plastic components for the automotive and the non-automotive industry.
Job Profile:
Process Setting, Machine allotment according production plan, Expedite Mold allotment for maintenance & Manpower handling.
Solving the troubleshooting for 4M techniques.
Maintain the all documents for the production.
Scientific Process Study for Critical Mould.
Well knowledge in plastics materials.
New mold trial/Analysis.
New Robot Programming (Basic / Advanced).
Process Optimization, Controlling of Parameters, Process Stability and standardization.
To take initiate on Continual Improvement projects a reduction of Manufacturing process parameter and variation in product characteristics.
Improving OEE, To run the M/C with full efficiency
To concentrate on Customer Audits points / Improvement activities
Trainer for Technicians, Group Leaders & Operators.
Sharing of technical points with other teams.
Increase of Productivity & reduction of part weight in scientific molding
Reduction of Mould change time using Quick mould change system.
To identify the root cause of problem through 7QC tools for reduction the rejection.
Maintain the 5s.
Follow the TPM activity.
Develop all new parts SOP, PPS and work instruction for mold loading and unloading.
Submitted the reports for the customer complain.
Calculate the yield reports.
Project Handling:
Ford- B515 (Eco Sport )
Ford- B515 ICA
Ford- U375 (Everest )
Ford- B299 MCA
Chevrolet – Enjoy
Blue-star
Hitachi
To associate myself with an organization that provides a challenging and dynamic environment and to keep adding value to the organization that I represent while concurrently upgrading my skills and knowledge
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com